Astera Data Pipeline Builder is a no-code solution for designing and automating data pipelines. It allows users to read and write data across various file formats, databases, and applications. Users can execute ETL and ELT pipelines manually, schedule automated reruns, or integrate them into broader data management processes.
N/A
Control-M
Score 9.3 out of 10
N/A
Control-M from BMC is a platform for integrating, automating, and orchestrating application and data workflows in production across complex hybrid technology ecosystems. It provides deep operational capabilities, delivering speed, scale, security, and governance.
$29,000
per year
Pricing
Astera Data Pipeline Builder (Centerprise)
Control-M
Editions & Modules
Centerprise Enterprise
Contact rep
Lifetime License per Seat
On-Premise
Contact Sales
SaaS
Starting at $29,000
per year
Offerings
Pricing Offerings
Astera Data Pipeline Builder (Centerprise)
Control-M
Free Trial
Yes
Yes
Free/Freemium Version
No
No
Premium Consulting/Integration Services
Yes
Yes
Entry-level Setup Fee
No setup fee
Optional
Additional Details
Discounts are provided for 10 pack, 20 pack, 50 pack, and enterprise wide Centerprise Professional licenses.
I have only been using Astera Centerprise for about 6 months and I am still learning the ins and out of it. A scenario where it seems to do well is in generating reports from SQL queries that we already had and no longer have to run the reports manually. The SQL Query Source object has been the most useful tool for me thus far. I have yet to fully stress test the server side of Astera Centerprise, but currently there have been some version updates that required me to re-set up all the scheduled jobs that we have. We only have 8 jobs thus far but have plans to expand this into the hundreds and those same updates would require exponential amounts of work.
Handling automation backend jobs helped avoid team and customer escalations. One hundred jobs are running behind the server, for which manual monitoring is ineffective. Therefore, automated scripts are used, which are run via Control-M Jobs. There is no restriction on job scheduling. I can schedule N number of jobs as per convenience and business needs.
When purchasing Astera Centerprise you are given options on how you would like to be trained and each option comes with a different price tag. We chose to be trained using online meetings over several days. The training went too fast and it was not always easy to understand until I started using the product.
I am a person that wants to learn how and why something works so that I can use the knowledge in the future. When contacting the support team they take the problem, create a solution for you and send it back. The solutions always work, but when I get the solution I have to review every field and function to understand how it works so that I can re-create it for another solution I need. I would much rather have the support team explain what I had done incorrectly and what they changed or I would like to find a solution with them instead of having it handed to me.
Astera uses license keys to allow their customers rights to only the functionality that was purchased. Each user and server has its own key and each key is only good for one year. There have been 2 different times that we received keys that had less functionality that we purchased. It wasn't until it created problems that we noticed and had to request new keys. This year our sales representative made sure she was available when we updated our keys so that if there was a problem she could fix it right away; however, there were not issues this year. I believe this is something they pay closer attention to now.
I haven't come across too many spots where I'm not happy with the product. Most of the shortfalls were in my knowledge of the product as opposed to the actual product. Currently we're having a little bit of an issue with the deployment of the software to the servers, but it's more of an "us" problem than a product problem. I can't really give any good examples of shortfalls of the product that I've found so far.
We've been using Astera Centerprise application for the last 6 years and we've already added EDI connect to it. Both applications are working really well for our enterprise needs so far with no issues, so we'll continue renewing the licenses.
It is one of the best solutions on the market, in terms of innovation, reliability and stability. Control-M provides security when used by the largest companies in Mexico such as banks, department stores and logistics. It has proven to be able to integrate with new technologies on the market and provide almost 100% availability, thanks to its automatic FailOver scheme.
Centerprise is highly usable; however the version we are currently using could be a little more intuitive in some areas though by no means unworkable. I think some of the issues we have have been addressed and solved in the latest version.
It has an excellent graphical user interface and robust functionalities, which any scheduling tool currently has in the current market. Strengthening security measures, such as role-based access control and encryption, is essential to protect sensitive data. Providing tools to optimize resource utilization and reduce costs would be valuable. Limited options for customizing the user interface can hinder productivity. Allowing users to tailor the interface to their needs would enhance the experience.
In most cases Astera is stable. However, our client experiences the error from time to time. Mostly they are related to cdc file and ServerAdminConfig.xml file.
Secondary Instances: Control-M supports the installation of a secondary instance of the entire Control-M environment, Control-M/EM, or Control-M/Server.Automatic & Manual Failover: In case of a failure on the primary host, Control-M can automatically failover to the secondary host if using Oracle or MSSQL databases. Manual failover is also an option, enabling a controlled switch during planned maintenance.Fallback: After resolving the issue on the primary host, you can easily fall back to it, or even designate the secondary host as the new primary. Database Replication: For high availability, Control-M leverages database replication from the primary site to a disaster recovery site. While replication is essential, its implementation and maintenance are the user's responsibility.
good page load times, efficient report completion, and minimal impact on integrated systems. Specifically, the well-designed GUI contributes to a positive user experience, and the platform's ability to automate various stages of the workflow, including Big Data processes, is highlighted as a key strength. Fast Page Loads: Control-M is reported to have a responsive user interface with fast page load times, allowing users to quickly navigate and manage their workflows
Support is great! No matter if you need technical assistance or you have general questions about the tool - the support is very responsive and provides solutions quickly. They are available via various channels, which makes it very convenient to get in touch with them (Support portal, direct email contact, LinkedIn).
Support is generally excellent. Getting lower priority ones resolved can take a while, but it's rare for something to have to be dumped in the "unfixable" bin. If you end up speaking to Houston or Tel Aviv, then you know you've got a "live one".
Very knowledgeable instructors provide a hands-on, collaborative learning experience and can interact directly with instructors to develop our Control-M skills. This format allows for immediate feedback, in-depth discussions, and tailored guidance, leading to a deeper understanding of Control-M concepts and practical application. Face-to-face interaction fosters higher engagement and a more dynamic learning environment.
Simple and easy to use web based, well paced. Available any time. All online courses are simple and easy to access and use. Very practical everyday use scenarios and solutions. Incorporates software simulations, learning games, and built-in assessments to enhance comprehension and engagement. Online subscriptions are regularly updated with the latest product information, ensuring users have access to the most current knowledge.
Astera support provided us implementation/installation tutorial and we were able to perform all the activities. Also one of the support was there to shadow us to make sure the process was smooth with no issues
As HA we have depend on the external DB, why don't we have HA feasibility with embedded DB. As with external DB, there are performance issues and fine tuning the DB. As if its embedded DB, Control-M it self take care of the functionality.
We looked at continuing to use SSIS as an alternative. Although we own SSIS as part of our SQL licensing, we found that it takes a much higher skill level to create solutions. It also does not have the ability to parse unstructured data the way that Centerprise Data Integrator can. We also looked at Datawatch Monarch as a possibility but found it over-all to be cost-prohibitive. We also looked at a cheaper alternative called SimX but did not have a strong confidence in the product as we evaluated it. We landed on Centerprise Data Integrator as it met all of our business requirements and we know we could leverage it for many uses across our enterprise.
Redwood RunMyJobs seemed impressive as well since it was also cross-platform, flexible, and versatile. However, we went with Control-M because it was less expensive and we were already using it on our mainframe environment. The distributed version of Control-M was much more user-friendly due to the GUI instead of the command-line interface used on the mainframe.
I was helping on purchase this product but I am not sure about the term and pricing for it. But based on what I understand that the term of the licenses are good.
While Control-M offers flexibility with usage-based and subscription-based pricing, some users might prefer more predictable, upfront costs, especially for large-scale deployments. A potential area for improvement could be offering more options for fixed-term contracts with predictable pricing based on factors like the number of agents or jobs, providing a clearer budget for long-term planning
I think Astera can do multiple things. However, we are not sure what it can do. We only know the basic features. If they can give us some kind of training, then we maybe able to benefit for it. We are planning to use their Azure connection in the future. If they can provide the training for it, it will be wonderful.
awesome product.Control-M delivers advanced operational capabilities easily consumed by Dev, Ops, data teams, and lines of business.Control-M Workflow InsightsApplication and data workflow observability: Increased confidence that SLAs are being met for Control-M users and IT leadersComprehensive control and management capabilities: Enhanced dashboards and reporting with constant telemetry and intelligent analysis on executing workflowsSelf-service visibility: In-depth reporting to help teams work autonomously
Strengths: The vendor provided strong post-sales support, timely issue resolution, and effective onboarding. Their technical team was knowledgeable and responsive, ensuring smooth integration and minimal disruption. Training resources and documentation were comprehensive. Areas for Improvement: While overall service was excellent, occasional delays in advanced customization or escalations slightly impacted timelines. More proactive optimization suggestions could further enhance value.
It is tough to say on how Centerprise would have helped us with ROI. Unfortunately our project (after 3 years) was scrapped (put on hold) due to the impromptu purchase of another Crop Insurance company. But with that, Centerprise was huge in getting our warehouse loaded for our BI Team to make important decisions about our policies.
Control-M has improved service delivery times, reliability and quality of batch processing.
It has simplified the management of the operation and the use of the alert system has made it possible to act in a coordinated and efficient manner to solve problems.
The implementation of policies has made it possible to make greater use of Control-M and thus reduce development costs that are generated unnecessarily when the potential of the system is not considered.