Autodesk offers 3ds Max, 3D modeling and rendering software for design visualization, games, and animation. The vendor states that users can produce professional-quality 3D animations, renders, and models with an efficient and flexible toolset to help create better 3D content in less time.
$235
per month per user
Revit
Score 9.1 out of 10
N/A
Autodesk’s Revit is a Building Information Modelling (BIM) tool. It enables architectural, MEP, structural, and engineering design, and provides analysis to support iterative workflows
$350
per month
Pricing
Autodesk 3ds Max
Revit
Editions & Modules
Monthly Subscription
$235
per month per user
Yearly Subscription
$1875
per year per user
3-Year Subscription
$5625
3 years per user
Monthly
$350
per month
1-Year
$2805
per year
3-Year
$8415
per 3 years
Offerings
Pricing Offerings
Autodesk 3ds Max
Revit
Free Trial
Yes
Yes
Free/Freemium Version
No
No
Premium Consulting/Integration Services
No
No
Entry-level Setup Fee
No setup fee
No setup fee
Additional Details
Flex pricing available for limited usage. Minimum plan $300 for 100 tokens. 3ds Max costs 6 tokens per day.
Pricing available for monthly, annual, or 3-year subscriptions. Longer subscriptions offer greater discounts.
More Pricing Information
Community Pulse
Autodesk 3ds Max
Revit
Considered Both Products
Autodesk 3ds Max
Verified User
Employee
Chose Autodesk 3ds Max
Best for rendering and geometry flexibility. Interphase is also superior. The stacking of modifiers is unique and allows for combining, and turning on and of which makes presenting options very agile, and clear without destroying the geometry. It's easily reversible. All others …
Revit is hands on and easy to learn. Very accurate and great for construction documentation. One can create in 2D and have elevations, sections and 3D views ready. So it is very helpful to visualize. Drawback - It is comparatively harder to draw curves and spherical …
For print media for marketing and for 3d animations for web spots and TV ads/movies/programs. It is less suited for quick 3d graphics or images that you get from AI image programs, but it is much more powerful than most AI image programs.
Revit is well suited for creating collaborative projects that are fully integrated into the design and construction document process. We work a lot with engineering firms who also use Revit and the program allows us to fully integrate and coordinate our models together to make sure that everything is correct. I can see where my electrical engineer has placed lighting into the model and same with my mechanical engineer and their HVAC equipment
3D Models - It's kind of a no brainer, but the key benefit of Revit is its ability to model in 3D. It's a somewhat complex modeling environment, however, it's not impossible to learn and I have seen users from a range of abilities to effectively model content in Revit.
Schedules - 3D is great, but the ability to quantify your geometry is contains valuable data if modeled correctly. If you model how you will build it, Revit has the ability to give very accurate schedules which includes quantities, and any data you would like to incorporate into your model.
Industry Standard - Revit is the industry standard. With that being said, it really help to use software that is compatible with other agencies for collaborative model review.
There are often several ways to draw certain things, but the object will have different capabilities based on the way it is drawn. This can be confusing when trying to use the object.
The way objects are drawn is not always user-friendly. This program would be difficult for someone to figure out on their own without having any Autodesk background.
There should be a better way to track changes in the model. Often times the architect will not share a model during construction to avoid sending changes that aren't finalized or complete.
It satisfies 95% of my 3d visualization need. The left over 5% is handled by a few other programs. If Max just can't perform a specific task I can do that elsewhere and then bring it back to Max to finish up. But, it's rare that this occurs in my work
We will almost certainly be renewing all of our current seats of Revit and will likely be adding seats as we look to get more and more of our staff trained and using Revit. The software is starting to become the standard for our projects as we move forward as more and more of our clients are requesting or accepting use of it
It is a very difficult program to learn to use and even harder to use well. But once you get to using it it is a great software package to know how to use. Getting to be good at using it takes lots of use.
It is a professional environment, but far from easy and overly complex in many places. The system is often too deep in settings and overrides (see Visibility/Graphics in combination with linked files, filters, color overrides and view templates). I don't really like the dialog-in-dialog interface and its spartan looks. But it works well overall if you know what you are doing.
Revit seems to always be available when I need it. I have not experiences an outage. There are occasions where we need our internal IT department to trouble shoot a file on our Revit dedicated server and that sometimes causes a delay however that is not a software access issue
Revit is a fairly graphics heavy piece of software. It is powerful in its capabilities but as a result it takes a lot of the graphics card, the memory, etc. For all that it can do and the specs of my computer I find it pretty good from a performance standpoint
Autodesk has always had a good support system in place. There is a massive user base for Revit, and there are thousands of forum threads and other discussions online about any and every problem that you could ever run into. For being such a large program with so many different options, there aren't many roadblocks or pitfalls that users can fall into.
The training was Revit Essentials and it was very beneficial. I would say that it is best to get the training right before you know you will be using Revit as learning the basis then applying what you learned immediately is the most effective and best value for your money.
The online training is hit or miss. I feel that its better to be live to be able to pace and ask questions to a live person as you are learning hwo to do things. Its not natural to learn Revit especially if you know AutoCAD so my suggestion is the live training
Implementing Revit as your main drafting software (i.e. moving to BIM from CAD) may be a tough decision if you have learned drafting. It is a different way to approach and think about developing a project. However, if you are able to adapt to a new way of thinking and get used to it by working through a few projects than it is as efficient as CAD in most areas in general and will also be both better/worse in some areas
In Autodesk 3ds Max you can do camera animation with ease, its complex in Cinema 4D. Even I think same with light setup. Setting up light is quite easy in Autodesk 3ds Max as compare to Cinema 4D. Overall Autodesk 3ds Max is less complex in compare to other 3D softwares.
Revit like AutoCAD can produce both a 3d model & 2 dimensional drawings such as plans, elevations & sections which are required for any design project to be communicated on paper for construction. But unlike AutoCAD, Revit's focus is to build a 3d model that contain smart information for construction. So for Revit the 2 dimensional drawings becomes a byproduct. In addition to the required drawings needed on paper to communicate the design, Revit offers so much more information in the model for all engineering disciplines.
While I am not directly involved with the deployment of Revit, it seems that our internal IT department has appreciated the ability to increase or decrease the number of seats. I have never had an issue with the deployment if and when needed, especially regarding the availability of a set
3ds Max has one of the best control tools that can help someone to sculpt almost anything. With the vertex tool and polyline edit function we can create almost any complex geometry.
Default rendering is equipped with almost everything that is needed for process, V-Ray for 3ds Max is the best 3rd party plugin for getting crisp renders.
The four view port tools for viewing the model helps from each and every angle. The moment and selection tools in the 3ds Max are quit easy to operate.
It's positive. It saves quite a bit of field time when used correctly, and lets us make sure we have proper room for all equipment and ductwork.
Helping minimize field 'thinking' time is an immediate add to the bottom line. 1 guy designing on the front side saves down time of 5-10 guys waiting in the field. Cost savings on labor is apparent.
Coordination time is also cut down, saving on office time. It's easy to spell out what your plan of attack is. All these savings directly add to bottom line profit by not expending labor.