JungleDocs vs. Oracle Primavera Submittal Exchange
JungleDocs vs. Oracle Primavera Submittal Exchange
Product | Rating | Most Used By | Product Summary | Starting Price |
---|---|---|---|---|
JungleDocs | N/A | JungleDocs takes properties and parts of an existing document and puts them into a new one. The vendor’s value proposition is that this prevents possible mistakes and saves up to 90% of the user’s time that would be used on inputting and copy-pasting operations. Key features include: Word and PowerPoint document generation and automation Document mail merge from SharePoint lists Template processing engine uses Open XML technology for very fast and… | N/A | |
Oracle Primavera Submittal Exchange | N/A | Oracle Primavera Submittal Exchange, part of the Primavera product suite, is offered as a secure, online system for electronically exchanging, reviewing, and archiving design and construction project documentation. | N/A |
JungleDocs | Oracle Primavera Submittal Exchange | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Editions & Modules | No answers on this topic | No answers on this topic | ||||||||||||||
Offerings |
| |||||||||||||||
More Pricing Information |
JungleDocs | Oracle Primavera Submittal Exchange | |
---|---|---|
Top Pros | ||
Top Cons |
|
|
JungleDocs | Oracle Primavera Submittal Exchange | |||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Human Resource Management |
| |||||||||||||||||||||||||||||||||||||||||||||
Payroll Management |
| |||||||||||||||||||||||||||||||||||||||||||||
Reporting & Analytics |
| |||||||||||||||||||||||||||||||||||||||||||||
Construction Project & Field Management |
| |||||||||||||||||||||||||||||||||||||||||||||
Estimating |
|
JungleDocs | Oracle Primavera Submittal Exchange | |
---|---|---|
Likelihood to Recommend | 7.6 (3 ratings) | 8.0 (1 ratings) |
JungleDocs | Oracle Primavera Submittal Exchange | |
---|---|---|
Likelihood to Recommend | EnovaPoint, LLC
| ![]() Oracle
|
Pros | EnovaPoint, LLC
| ![]() Oracle
|
Cons | EnovaPoint, LLC
| ![]() Oracle
|
Alternatives Considered | EnovaPoint, LLC
| ![]() Oracle
|
Return on Investment | EnovaPoint, LLC
| ![]() Oracle
|