CostX is a construction and estimation software offering from Exactal Technologies Pty Ltd.
N/A
Trimble ProjectSight
Score9.6 out of 10
N/A
Trimble ProjectSight, replacing the former Prolog, is a construction project management software solution for contractors and other AEC firms, providing a complete system of record for managing project information, from the field to the back office. Designed by construction professionals for construction professionals, ProjectSight is built for project managers accountable for construction costs, scope and schedules, and for project teams responsible for the successful delivery of projects.…
N/A
Pricing
iTWO costX
Trimble ProjectSight
Editions & Modules
No answers on this topic
No answers on this topic
Offerings
Pricing Offerings
iTWO costX
Trimble ProjectSight
Free Trial
No
No
Free/Freemium Version
No
No
Premium Consulting/Integration Services
Yes
Yes
Entry-level Setup Fee
No setup fee
No setup fee
Additional Details
Pricing is determined by a number of factors. For example, would you want to use BIM or just 2D? Do you need estimating spreadsheets and report generation? Would you want to buy 100 copies or just one? If you send in a sales enquiry to sales.int@rib-software.com, we’ll be able to send you through a quote that will meet your requirements.
—
More Pricing Information
Features
iTWO costX
Trimble ProjectSight
Reporting & Analytics
Comparison of Reporting & Analytics features of iTWO costX and Trimble ProjectSight
Feature
iTWO costX
8.7
1 Ratings
13% above category average
Trimble ProjectSight
10.0
1 Ratings
26% above category average
Standard reports
9.01 Ratings
00 Ratings
Custom reports
8.01 Ratings
00 Ratings
Data exportability
9.01 Ratings
00 Ratings
Dashboards
00 Ratings
10.01 Ratings
Construction Project & Field Management
Comparison of Construction Project & Field Management features of iTWO costX and Trimble ProjectSight
Feature
iTWO costX
9.0
1 Ratings
16% above category average
Trimble ProjectSight
5.0
3 Ratings
42% below category average
Plan distribution & viewing
9.01 Ratings
6.13 Ratings
Plan markups & sharing
9.01 Ratings
6.13 Ratings
Issue tracking & punchlists
9.01 Ratings
6.13 Ratings
Photo documentation
00 Ratings
6.13 Ratings
Jobsite reports
00 Ratings
4.02 Ratings
Document sharing
00 Ratings
3.02 Ratings
RFI tools
00 Ratings
5.63 Ratings
Collaboration & approvals
00 Ratings
2.03 Ratings
As-built drawings
00 Ratings
6.01 Ratings
Mobile app
00 Ratings
4.01 Ratings
Submittal design and management
00 Ratings
6.12 Ratings
Checklists
00 Ratings
9.01 Ratings
Change orders
00 Ratings
1.01 Ratings
Estimating
Comparison of Estimating features of iTWO costX and Trimble ProjectSight
Easy to use, one-stop for all construction-related tasks. The best thing is the split-screen, during the Bill of Quantity verification users can see for what part of the design Bill of Quantity is generated. Auto-updating of Design is another good feature.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
I would probably recommend Trimble ProjectSight (Prolog) over Procore, as it is an easier user interface and typically avoids any problems with the users. I would say that it does take some getting used to, but once you are used to it it is pretty easy to use. This would be good for a residential home in construction.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Allows multiple users to work on the same estimate at once. This is huge!! Not only can we team up on a project that has a quick deadline but we can also simultaneously collaborate on database updates.
Performs your takeoff on CAD drawings or vector PDFs. Your typical takeoff software does takeoff on an unintelligent PDF. I say unintelligent because the process you go through is simply to trace the boundaries of your shape. This is time-consuming and can lead to mistakes. With CostX your cursor will stick to the line lines and takeoff the exact measurement. This has cut our takeoff time by 75%. The best part is that this is done in the same software as your estimating software. There are a few software's that have takeoff and estimating in one but CostX is the only one the provides CAD smart takeoff.
CostX is a lot like Excel. You have the flexibility to set up your workbooks the way your project team thinks. For example, ours is set up to evaluate labor in two ways; productivity (man-hours per widget) or crew hours (3 guys for two days for a given activity).
Reports are very flexible and the report writers is much easier than Crystal reports.
If you subscribe to the full version of CostX this provides the most powerful feature of them all......Auto-Revisioning. This function will compare two sets of drawings, identify the changes on a color coded drawing, ask for you to approve the changes and then update your estimate and takeoff. You can even use this to produce custom print outs for RFI's show your design team what changed.
Your estimating workbooks are live-linked to your takeoff. As you make adjustments to your takeoff your estimate updates accordingly. The workbook has color coded text to hep your team understand whats behind your estimate; Black = manually input, Blue = rates linked to database, and Green = quantity linked to take-off.
Full integrated subcontractor comparison. We use to do this in excel to compare multiple bidders across every division.
This is also color coded for a streamlined review process; green = quote, blue = estimate, purple = plug, and orange = other.
Built in error checking notifies you if you forgot to normalize an item on your subcontractor comparison.
In the near future the software will be available online allowing you to use remotely.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
I have only used Procore otherwise, and from what I remember Procore does not have as many features in terms of keeping track of CD documents, and organizing RFI's like Trimble does. I think overall Trimble ProjectSight (Prolog) is a better product, and if it was up to me I would pick Trimble ProjectSight (Prolog) over Procore.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Easy to Collaborate Between the Team members. Saves a lot of work
Integrate with multiple types of data drawing which saves efforts in converting the design.
Bill of Quantity export can be done based on the Design section and can share with contractors for Quotes. Instead of just downloading the whole report and then editing for the required pack.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info