TrustRadius: an HG Insights company

Oracle Primavera Portfolio Management vs. QuoteSoft

Save this comparison

Save this comparison

Add Product

Recommended Comparisons

    Overview
    ProductRatingMost Used ByProduct SummaryStarting Price

    Oracle Primavera

    Score7.8 out of 10
    N/AOracle’s Primavera is a software suite designed for construction and other asset-intensive industries. It contains a variety of project planning, management, and execution components for buyers to select from.N/A

    QuoteSoft

    Score9 out of 10
    N/AAcquired by ConstructConnect from Quote Software, QuoteSoft is a construction and estimation software for mechanical, piping, plumbing, HVAC and ductwork.N/A
    Pricing
    Oracle PrimaveraQuoteSoft
    Editions & Modules
    No answers on this topic
    No answers on this topic
    Offerings
    Pricing Offerings
    Oracle PrimaveraQuoteSoft
    Free Trial
    NoNo
    Free/Freemium Version
    NoNo
    Premium Consulting/Integration Services
    NoNo
    Entry-level Setup FeeNo setup feeNo setup fee
    Additional Details——
    More Pricing Information
    Best Alternatives
    Oracle PrimaveraQuoteSoft
    Small Businesses
    No answers on this topic
    PlanSwift, by ConstructConnect
    Score3 out of 10
    Medium-sized Companies
    Microsoft Project Server
    Score5.1 out of 10
    Sage Estimating
    Score9.5 out of 10
    Enterprises
    Planview PPM Pro
    Score8.9 out of 10
    No answers on this topic
    All AlternativesView all alternativesView all alternatives
    User Ratings
    Oracle PrimaveraQuoteSoft
    Likelihood to Recommend
    8.0
    (12 ratings)
    9.0
    (2 ratings)
    Usability
    8.0
    (1 ratings)
    -
    (0 ratings)
    User Testimonials
    Oracle PrimaveraQuoteSoft
    Likelihood to Recommend
    Oracle
    Oracle Primavera Portfolio Management is a utilitarian product of a yesteryear gone by. It's straightforward and to the point. It is well suited for a customer base who is not interested in frills, portability, or a multitude of OOTB ability. It's for those who like to restrict and manage all control over users, code in queries, functions, and create customized reports for end users. It does what it does very well however, just do not expect it to be pretty. It's a 2007 product, so curb your excitement. It does handle all aspects of portfolio management well; financials, budgeting, spend plans, contracts, projects, staffing, workflows, etc... however, it is not intuitive to navigate, and will require some training.
    Incentivized
    Read full review
    ConstructConnect
    Quotesoft again is very well suited to any estimating department. I recommend a large screen monitor, but it's far more convenient than the old quick pen table or other methods. It's been great for jobs post mortem as well, we'll go back over as builds and make sure we captured and adjust estimates or change orders. It's also great for illustrating changes, and having all be very accurate.
    Incentivized
    Read full review
    Pros
    Oracle
    • Primavera as a scheduling software can manage large project schedules regardless of complexity.
    • P6 is powerful enough to identify the longest pathway to the completion of a project. This is also known as CPM.
    • P6 can handle multiple scenarios and save them as a separate baseline schedule. This can be helpful for figuring theoretical sequences.
    Incentivized
    Read full review
    ConstructConnect
    • Once you're over the learning curve, it's fantastic at getting accurate material takeoff. Because one is working off the real PDF prints of the project, it's very easy to get a good material list and takeoff.
    • Excellent for giving options of transitions and allowing the user to account for the actual 3rd dimension of the project by being able to click and add the sections needed to transition between floors.
    • The speed in which the user is able to takeoff is so much faster than traditional methods, and more accurate and easier to use than the other options on the market. Prints out great reports showing materials and hours, and lets you color code the systems while estimating so you know you aren't duplicating efforts.
    • Very flexible as far as how it adjusts for your desired estimate. You can identify per floor, side of the building, system, etc.
    • Allows for fast on the fly adjustments of sizes, materials and types of transitions with ductwork.
    Incentivized
    Read full review
    Cons
    Oracle
    • The software is high end with rich features, hence its rich price.
    • There is room for improvement in their customer service.
    • Oracle is doing its best in coming up with new features, and has a planned roadmap. It would be good if the enhancements are delivered faster.
    Incentivized
    Read full review
    ConstructConnect
    • I'd prefer an 'all in one' as opposed to modules. I believe it's offered in that fashion but it was a touch more expensive. I was able to negotiate a footage takeoff tool for piping, to make it easier and more economical to our specific use, which is 95% dry side hvac estimating.
    • Would be great if it could be preloaded with Smacna or MCA factors for labor, and also would be great if there was a faster way to update material costs. You do need to stay on top of your material factors and make adjustments per the price of steel and other consumables. The industry has been stable lately, but if for some reason you were lax in updating labor and material factors, you could be off on the estimate. That's true of ANY software or even standard old school estimating approach.
    • It does require a dongle and a per seat license. The one drawback I don't care for, in a small company with tight cash flow, I do have estimators sharing the seat and scheduling takeoff around each other. Pretty standard though.
    Incentivized
    Read full review
    Usability
    Oracle
    Is easy to use but the the interface should be more nice and contemporary
    Incentivized
    Read full review
    ConstructConnect
    No answers on this topic
    Alternatives Considered
    Oracle
    Oracle is better laid out and has more functionality as well as end-user flow. The login process, billing, and construction management features are easy to find, easy to use, and helpful. The limitations on Quickbooks restrict users from the ability to view and bill full contracts if broken down, to track and show % complete. Procore is confusing.
    Incentivized
    Read full review
    ConstructConnect
    We were looking at this, as well as quick pen, and other industry standard programs like Wendes. QuoteSoft was far more versatile, user friendly and has proven to be the right choice. No specific equipment outside of a bigger monitor, ease of use, and tech support as well as the online training aspect was fantastic. Felt well supported while we rolled it out.
    Incentivized
    Read full review
    Return on Investment
    Oracle
    • P6 is critical to the execution of all of our projects. Without it we would have less control of our projects.
    • One of our key business objectives is to deliver projects on time or ahead of schedule. P6 supports us in this goal and allows our superintendents to manage complicated construction projects.
    Incentivized
    Read full review
    ConstructConnect
    • First positive impact is time saved. We're able with our small team to estimate..ACCURATELY far more projects, thus winning more projects.
    • Accuracy once we had our factors programmed is fantastic. It's tightened up our material and labor hours and made us more competitive
    • Definitely has had a great return on investment. Helping to land more projects out of the sheer amount of available time to bid more, as well as being more confident in material costs.
    Incentivized
    Read full review
    ScreenShots