Oracle Primavera Portfolio Management vs. Trimble GC WinEst

Overview
ProductRatingMost Used ByProduct SummaryStarting Price
Oracle Primavera
Score 7.9 out of 10
N/A
Oracle’s Primavera is a software suite designed for construction and other asset-intensive industries. It contains a variety of project planning, management, and execution components for buyers to select from.N/A
Trimble GC WinEst
Score 5.0 out of 10
N/A
With thousands of users world-wide, WinEst estimating from Trimble GC is a database-driven construction project management solutions on the market. It looks and feels just like Excel with familiar Windows navigation, including drop-down menus and ribbon bars. Behind the covers is a database with multiple work-breakdown structures (WBS) and filters that can be customized to the user's preferences so that estimating data can be sliced and diced and presented in different ways. WinEst…N/A
Pricing
Oracle Primavera Portfolio ManagementTrimble GC WinEst
Editions & Modules
No answers on this topic
No answers on this topic
Offerings
Pricing Offerings
Oracle PrimaveraTrimble GC WinEst
Free Trial
NoNo
Free/Freemium Version
NoNo
Premium Consulting/Integration Services
NoNo
Entry-level Setup FeeNo setup feeNo setup fee
Additional Details
More Pricing Information
Community Pulse
Oracle Primavera Portfolio ManagementTrimble GC WinEst
Features
Oracle Primavera Portfolio ManagementTrimble GC WinEst
Estimating
Comparison of Estimating features of Product A and Product B
Oracle Primavera Portfolio Management
-
Ratings
Trimble GC WinEst
8.6
1 Ratings
13% above category average
Takeoff tools00 Ratings3.01 Ratings
Job costing00 Ratings10.01 Ratings
Cost databases00 Ratings10.01 Ratings
Cost calculator00 Ratings10.01 Ratings
Bid creation00 Ratings10.01 Ratings
Best Alternatives
Oracle Primavera Portfolio ManagementTrimble GC WinEst
Small Businesses
monday.com
monday.com
Score 8.3 out of 10
FollowUp CRM
FollowUp CRM
Score 10.0 out of 10
Medium-sized Companies
Planview PPM Pro
Planview PPM Pro
Score 9.0 out of 10
InEight
InEight
Score 8.5 out of 10
Enterprises
Planview PPM Pro
Planview PPM Pro
Score 9.0 out of 10
InEight
InEight
Score 8.5 out of 10
All AlternativesView all alternativesView all alternatives
User Ratings
Oracle Primavera Portfolio ManagementTrimble GC WinEst
Likelihood to Recommend
8.0
(12 ratings)
10.0
(2 ratings)
Usability
8.0
(1 ratings)
-
(0 ratings)
Support Rating
-
(0 ratings)
10.0
(1 ratings)
User Testimonials
Oracle Primavera Portfolio ManagementTrimble GC WinEst
Likelihood to Recommend
Oracle
Oracle Primavera Portfolio Management is a utilitarian product of a yesteryear gone by. It's straightforward and to the point. It is well suited for a customer base who is not interested in frills, portability, or a multitude of OOTB ability. It's for those who like to restrict and manage all control over users, code in queries, functions, and create customized reports for end users. It does what it does very well however, just do not expect it to be pretty. It's a 2007 product, so curb your excitement. It does handle all aspects of portfolio management well; financials, budgeting, spend plans, contracts, projects, staffing, workflows, etc... however, it is not intuitive to navigate, and will require some training.
Read full review
Trimble
WinEst is truly built for everyone. Their assemblies/database linking is perfect for self perform and subcontractors while their database management and custom reporting is perfect for GCs. While Excel set the bar, WinEst is on another planet. With the immediacy required by today's markets, WinEst allows you to deliver a superior product while being more accurate.
Read full review
Pros
Oracle
  • Primavera as a scheduling software can manage large project schedules regardless of complexity.
  • P6 is powerful enough to identify the longest pathway to the completion of a project. This is also known as CPM.
  • P6 can handle multiple scenarios and save them as a separate baseline schedule. This can be helpful for figuring theoretical sequences.
Read full review
Trimble
  • It's very flexible when building an estimate and selecting items to include. You can either click your way to the datebase or quickly copy and paste similar items.
  • The numerous ways to view and estimate whether it's by CSI, Uniformat, Master Format, or any view you'd like to see. One of ours is by program area, i.e. Sitework, Tower, Parking Deck, etc. After that, you can sort by Bid Package, CSI, etc. Quick buttons can be created far all the views you'd need which allows changing between views a breeze.
  • The visual interface is pleasing and easy to read.
  • It's easy to create your own database using Excel. Once you tag an item with unit costs, sort codes, etc., Winest will import it. You can also build it manually within the program but Excel was faster.
Read full review
Cons
Oracle
  • The software is high end with rich features, hence its rich price.
  • There is room for improvement in their customer service.
  • Oracle is doing its best in coming up with new features, and has a planned roadmap. It would be good if the enhancements are delivered faster.
Read full review
Trimble
  • At times, WinEst controls feel counter intuitive. Also the tools available for actually developing the database can feel clunky. This means that if you do not take the time to create a robust import file, you will spend a serious amount of time fixing your errors.
  • WinEst is also an object based database which means that it is difficult to do mass dumps of information (mainly takeoff) into the program. While this is great for ensuring that everything is done purposefully, it does lead to extended hours of data entry
  • It takes hours upon hours of use before you begin to realize the true potential. The sheer number of tools is overwhelming and their help resources are very basic and only explain how to correctly enter the data but not the feature's best use cases.
Read full review
Usability
Oracle
Is easy to use but the the interface should be more nice and contemporary
Read full review
Trimble
No answers on this topic
Support Rating
Oracle
No answers on this topic
Trimble
Doug Quinn was our trainer and travels all over the country. Whenever I have an issue I shoot him an email and he quickly responds as soon as his training gets a break.
Read full review
Alternatives Considered
Oracle
Oracle is better laid out and has more functionality as well as end-user flow. The login process, billing, and construction management features are easy to find, easy to use, and helpful. The limitations on Quickbooks restrict users from the ability to view and bill full contracts if broken down, to track and show % complete. Procore is confusing.
Read full review
Trimble
WinEst simply blows excel and Timberline out of the water. The shear depth of functionality is unparalleled. Not only does WinEst deliver a better product, it also shortens the amount of man hours required for each bid, alternate, pricing exercise, etc. On top of this, it has a number of redundant safeguards for catching errors that the others don't have.
Read full review
Return on Investment
Oracle
  • P6 is critical to the execution of all of our projects. Without it we would have less control of our projects.
  • One of our key business objectives is to deliver projects on time or ahead of schedule. P6 supports us in this goal and allows our superintendents to manage complicated construction projects.
Read full review
Trimble
  • We've not measured the rate of return but WinEst has made us much more efficient and organized.
Read full review
ScreenShots