Facilities Asset Management Software Oracle Primavera Unifier aims to drive best practices that increase visibility and efficiency, allowing users to leverage extensive configurability along with prebuilt processes to automate any business process with custom forms and workflows.
Key Benefits:
- Configurability and governance—automate any process, from simple to complex, with total control and data ownership
- Cloud or on-premise deployment
- A comprehensive…
N/A
Sign In App
Score9.7 out of 10
N/A
Sign In App is presented as a smart and safe way to sign in. Visitor management and staff sign in for the modern workplace. Sign In App provides the tools to make visitor management and staff sign in processes simple, including features for health and safety and data compliance, and a free smartphone app which staff can use to sign in and out whether working on-site or remotely. Contactless sign in, occupancy alerts, contact tracing, evacuations and deliveries are…
Well suited: Used for construction domain for management of multiple vendors and sites. Used in cost management in energy domain company Not suited for: Partner users- once the company is inactive, all users will be inactive.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
This is wonderful for managing visitors across multiple sites and campuses including pre-registration, special QR codes for repeat visitors, email communications, check-in alerts (especially if someone arrives to see a specific staff member, for example), space management inside the building (visitors can check out/reserve specific spaces created based on the floor plan of your building), and mobile check in with geofencing is really cool! We tried to use it for class attendance and it worked, but improvements to make that easier were on the way.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. TR verified that a representative sample of customers was invited. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
I wanted the ability to create recurring events (for classes) for example without having to manually recreate everything. I made the suggestion and the dev team started working on it before I left the company which was great! They want to improve their product.
Non-profit discounts would have been really nice, although their prices are relatively affordable.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Primavera Unifier is right fit for construction-based or engineering based companies where there is a need to manage project costs, resources and deliverables to meet customer requirements. It is well suited for companies that run on Oracle ERP and companies that use Primavera P6 for scheduling. Primavera Unifier also has Accelerators which are pre-configured components that can be enhanced as per the business requirement. Overall, a good tool for managing complex customer projects
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
The mobile and iPad check-in experience, the overall cost of the app, the ease of use and implementation, and the ability for us to use it for different purposes were the main reasons we chose Sign In App over competitors.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info