TrustRadius: an HG Insights company

Save this comparison

Save this comparison

Add Product

Recommended Comparisons

    Overview
    ProductRatingMost Used ByProduct SummaryStarting Price

    Geotab

    Score8.7 out of 10
    N/AGeotab in Ontario offers their fleet management system, consisting of MyGeotab cloud platform for managing driver and vehicle information, driver tracking and route optimization, as well as driver and vehicle efficiency (e.g. fueling, maintenance, MPG benchmarking) analysis capabilities for cost-control and fleet expansion. Additionally, Geotab offers GO8, a hardware tracking device that integrates with the platform.N/A

    Primavera Unifier

    Score8.3 out of 10
    N/AFacilities Asset Management Software Oracle Primavera Unifier aims to drive best practices that increase visibility and efficiency, allowing users to leverage extensive configurability along with prebuilt processes to automate any business process with custom forms and workflows. Key Benefits: - Configurability and governance—automate any process, from simple to complex, with total control and data ownership - Cloud or on-premise deployment - A comprehensive…N/A
    Pricing
    GeotabPrimavera Unifier
    Editions & Modules
    No answers on this topic
    No answers on this topic
    Offerings
    Pricing Offerings
    GeotabPrimavera Unifier
    Free Trial
    NoNo
    Free/Freemium Version
    NoNo
    Premium Consulting/Integration Services
    NoNo
    Entry-level Setup FeeNo setup feeNo setup fee
    Additional Details——
    More Pricing Information
    User Ratings
    GeotabPrimavera Unifier
    Likelihood to Recommend
    4.0
    (1 ratings)
    8.3
    (5 ratings)
    Usability
    -
    (0 ratings)
    8.0
    (1 ratings)
    User Testimonials
    GeotabPrimavera Unifier
    Likelihood to Recommend
    Geotab
    Geotab is a good product. I think ultimately it falls short in the clunky-ness of the program. If you are not intending to have users utilize the website and instead are going to feed data into a BI tool I think it would be a great product. I think if you are aiming to have the website utilized by your users and are looking for a one-stop-shop to drive your end-users to for reporting and data and are aiming to manage the program out of the program itself—I would not recommend it. I think the UI and UX clunky-ness is a hindrance and will lead to a lot of training because the learning curve is so steep. If you have a large Training team owning this and can swing that, it would be fine. However, if you are scrappy and looking for minimal need to train and re-train and want something intuitive and with a low learning curve, this is not it.
    Incentivized
    Read full review
    Oracle
    Well suited: Used for construction domain for management of multiple vendors and sites. Used in cost management in energy domain company Not suited for: Partner users- once the company is inactive, all users will be inactive.
    Incentivized
    Read full review
    Pros
    Geotab
    • I appreciate the breadcrumb reporting and the ability to see specific data points every second.
    • The accident reconstruction is a great tool.
    Incentivized
    Read full review
    Oracle
    • Submittals
    • RFI's
    • Change Management
    Incentivized
    Read full review
    Cons
    Geotab
    • The UI is very clunky.
    • Reporting and dashboards are not intuitive.
    • The UX leaves a lot to be desired.
    Incentivized
    Read full review
    Oracle
    • Allowing to hyperlink within Unifier.
    • Ability to paste from Excel into Unifier.
    • The need for a modern design look and feel.
    Incentivized
    Read full review
    Usability
    Geotab
    No answers on this topic
    Oracle
    Primavera Unifier is right fit for construction-based or engineering based companies where there is a need to manage project costs, resources and deliverables to meet customer requirements. It is well suited for companies that run on Oracle ERP and companies that use Primavera P6 for scheduling. Primavera Unifier also has Accelerators which are pre-configured components that can be enhanced as per the business requirement. Overall, a good tool for managing complex customer projects
    Incentivized
    Read full review
    Alternatives Considered
    Geotab
    I think ultimately the product itself is good, however, the other competitors in the space have much better UIs and they almost all seem more intuitive. The reporting is easier to create and not just based in Excel and they feel more developed. I think that if Geotab were to focus on their UI and UX and really develop it more, there would be a significant bump in customer satisfaction for Geotab and they would be a huge force in the enterprise space.
    Incentivized
    Read full review
    Oracle
    It is more user friendly , easy in cost management, good for integrating with multiple tools as data sources
    Read full review
    Return on Investment
    Geotab
    • Tracking has allowed us to recover assets from exited employees saving us about $500k.
    • While we could have had a dent in our fuel costs from idling or speeding some of the mechanisms used in the system haven't allowed that to come to fruition.
    Incentivized
    Read full review
    Oracle
    • In my organization, multiple companies like Metrolinx are using, and business is increasing day by day.
    • Energy domain company like GE wind is using it now to manage their new project in sea wind installation.
    • Used BI reports user defined reports, and custom reports to get data from multiple sources.
    Incentivized
    Read full review
    ScreenShots

    Primavera Unifier Screenshots

    Screenshot of Cash Flow ManagementScreenshot of Project Cost ControlScreenshot of Contract ManagementScreenshot of Earned Value ManagementScreenshot of Fund ManagementScreenshot of Maintenance Management