Cisco HyperFlex Systems is a hyper-converged infrastructure product, based on technology acquired with SpringPath (acquired September 2017). Cisco's modern HCI solution is Cisco Compute Hyperconverged with Nutanix.
N/A
IBM Power
Score9 out of 10
N/A
The IBM Power product line is a family of servers.
Smaller sites that would benefit from a cluster of 2-5 nodes. Not saying that it can't scale above that, but I find HyperFlex a great solution for those sites. A simple 3-node edge cluster can provide a huge amount of resources and redundancy. It's also really easy to scale the environment to meet growth requirements.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
I'd strongly recommend IBM Power servers to anyone who has the budget for it. A Power Virtual Machine, what is generally called FlexTB VM, can support as many small VM of 256GB, and scale up to 32TB on the fly. If IBM recommended architecture is combined with your organizational reference architecture, then forget about running into unplanned downtimes.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. TR verified that a representative sample of customers was invited. More Info
UCS manager in HX is truly helping us in doing one touch firmware upgrades. Scaling of HX cluster (in few minutes) is too seamlessly due to service profiles.
HX does not hold you back by creating a single data store unlike other HCI products. With HX, you can create multiple data stores and allocate those to desired services. This help logically separate the install base on HX and removes confusion for the admins too.
We run high IOPs workload on HX, and we never felt latency issues due to the Cisco backbone (as you get FI as a TOR switch and options to choose 10G or 40G speeds).
With HX you truly enjoy a single window support from Cisco including for the top of the rack switch (FI in HX case). In other HCI infra, you certainly have to bank on to network switch vendor for support and bring HCI and switch vendor at one pane for troubleshooting latency related issues.
While we increased our footprint on HX, we didn't added additional administrators to support the landscape. This was possible because of the simplicity in managing HX clusters.
With HX we had setup stretched cluster between two near site data centres. This is a unique proposition in HX (we have 2 nodes in each data centre) and data centre failover works absolutely seamless.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. TR verified that a representative sample of customers was invited. More Info
there is the problem with starting cluster where there are not outside DNS and NTP services so we need to workaround this with additional storage or hosting it on the local storage.. many clusters has internal DNS/NTP services not available from outside and they need to be hosted on the HX
there is not RBAC or user mgmt on the CVMs so it is difficult to not add full permission for the people responsible for just shutdown and power on the cluster
native snapshots support with ibm backup products
running from not the only last snapshot in all use cases
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A solid IDE for editing programs. SEU was simple and solid. Then it became outdated and support for it ended as the language continued to evolve. That's fine. But RDi is expensive and shaky at best, and VS Code, while free, is severely lacking even the modicum of features RDi has.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. TR verified that a representative sample of customers was invited. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
This is one of the best systems on the market. You can have Flash/Copy which created another LPAR to look like the system you are copying. This takes seconds and not minutes. Then you can use BRNS to do full system backups nightly with no downtime. I am ready for us to upgrade to a Power 10.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. TR verified that a representative sample of customers was invited. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
They are very easy to set up and use once you re knowledgeable enough to deal with it. They are continuously enhance the user experience on the HMC and operations on the systems. Once setup it's like a beast, going on and on. I have experience with servers that are not being rebooted for more than 1000 days
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. TR verified that a representative sample of customers was invited. More Info
In all of the years I have used various Power System, I have never had any problems at all. Even when hackers were attacking our email servers and many users PCs, the IBM Power System came out completely unscathed. I haven't even had any application errors that were able to take the system down. Nor have I ever experienced an unplanned outage
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
The IBM Power System is built for integration. It supports multiple operating systems and you can run multiple OS's on the same box with no problems at all. It also supports a number of open source languages such as PHP, Java, Python, and Perl which helps you continue to grow and integrate with lots of other systems.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
More documentation is available now than when the product initially came out (which was an issue early on). Because it only supports UCS hardware, I think it does help with support issues. Nutanix has to support much more hardware. At the same time, you're dealing with the Cisco TAC, which can be mixed at times.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
On large-scale systems, the rating would have been 10. However, I have seen some cases in more rural areas where the IBM onsite support is not as available or of the highest quality as in the past. For software support, there are sometimes instances of language barriers.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Systems are robust and you need to know exactly what your are going to do with them. There are multiple configurations possible and you need to gather your requirements first, before going on with the implementation. Tuning is a must before migrating production systems
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. TR verified that a representative sample of customers was invited. More Info
HyperFlex is built on top of Cisco UCS infrastructure, which allows us to manage other non-HX servers attached to the same UCS environment. This allows us to tie everything together via Intersight and see all of the servers in our data centers. Other platforms don't really have a comparable offering.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Power server do not need a stack of software for viruses, spam and others... Power server do not need to have release often power server are much more strong then other manufacturer Power server do not need to restart offen
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. TR verified that a representative sample of customers was invited. More Info
This system can work in a small factory with a few users and easily scale out to thousands of users. It is truly amazing on how much you can throw at this box and it will just keep humming. It is great for use across multiple departments and even across multiple corporations. I worked at one company where we were hosting multiple corporations on just one large Power System and had ZERO problems.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
The simplified management makes it easier to operate and prevents mistakes.
Guided installation using the installer VM means you don't have to configure every component by hand. Improves deployment speed and lowers the risk of configuration issues.
Performance increase of 40-90% compared to our previous compute/storage cluster.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info