e-Builder is a cloud-based construction program management solution that manages capital program cost, schedule, and documents. It allows owners to measure and manage the capital project delivery process from planning, design, procurement, construction and operations.
N/A
iTWO costX
Score8 out of 10
N/A
CostX is a construction and estimation software offering from Exactal Technologies Pty Ltd.
N/A
Pricing
e-Builder
iTWO costX
Editions & Modules
No answers on this topic
No answers on this topic
Offerings
Pricing Offerings
e-Builder
iTWO costX
Free Trial
No
No
Free/Freemium Version
No
No
Premium Consulting/Integration Services
No
Yes
Entry-level Setup Fee
Required
No setup fee
Additional Details
—
Pricing is determined by a number of factors. For example, would you want to use BIM or just 2D? Do you need estimating spreadsheets and report generation? Would you want to buy 100 copies or just one? If you send in a sales enquiry to sales.int@rib-software.com, we’ll be able to send you through a quote that will meet your requirements.
More Pricing Information
Features
e-Builder
iTWO costX
Construction Project & Field Management
Comparison of Construction Project & Field Management features of e-Builder and iTWO costX
Feature
e-Builder
7.4
11 Ratings
3% below category average
iTWO costX
9.0
1 Ratings
16% above category average
Plan distribution & viewing
7.710 Ratings
9.01 Ratings
Plan markups & sharing
8.810 Ratings
9.01 Ratings
Issue tracking & punchlists
8.011 Ratings
9.01 Ratings
Photo documentation
5.410 Ratings
00 Ratings
Jobsite reports
8.010 Ratings
00 Ratings
Document sharing
8.011 Ratings
00 Ratings
RFI tools
7.48 Ratings
00 Ratings
Collaboration & approvals
7.411 Ratings
00 Ratings
As-built drawings
7.99 Ratings
00 Ratings
Mobile app
5.97 Ratings
00 Ratings
Reporting & Analytics
Comparison of Reporting & Analytics features of e-Builder and iTWO costX
Feature
e-Builder
-
Ratings
iTWO costX
8.7
1 Ratings
13% above category average
Standard reports
00 Ratings
9.01 Ratings
Custom reports
00 Ratings
8.01 Ratings
Data exportability
00 Ratings
9.01 Ratings
Estimating
Comparison of Estimating features of e-Builder and iTWO costX
Well suited for the owner's side of managing multiple projects as it allows for all aspects of a project from development to closeout to be managed on one platform. Not as appropriate for a general contractor as there is better software out there. e-Builder's app is not as effective as others.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Easy to use, one-stop for all construction-related tasks. The best thing is the split-screen, during the Bill of Quantity verification users can see for what part of the design Bill of Quantity is generated. Auto-updating of Design is another good feature.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Provide a document structure that is easy to navigate. All documents, even within a process, are stored in the document structure and easily accessed by those with the correct permissions.
Scheduling, especially with the new module is easy. It is helpful with a large organization where many hands touch projects to be able to forecast workloads (we have an in house engineering team who reviews all projects during their design phase)
Allows for easy interface with contractors and makes the submittal process more straightforward.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Allows multiple users to work on the same estimate at once. This is huge!! Not only can we team up on a project that has a quick deadline but we can also simultaneously collaborate on database updates.
Performs your takeoff on CAD drawings or vector PDFs. Your typical takeoff software does takeoff on an unintelligent PDF. I say unintelligent because the process you go through is simply to trace the boundaries of your shape. This is time-consuming and can lead to mistakes. With CostX your cursor will stick to the line lines and takeoff the exact measurement. This has cut our takeoff time by 75%. The best part is that this is done in the same software as your estimating software. There are a few software's that have takeoff and estimating in one but CostX is the only one the provides CAD smart takeoff.
CostX is a lot like Excel. You have the flexibility to set up your workbooks the way your project team thinks. For example, ours is set up to evaluate labor in two ways; productivity (man-hours per widget) or crew hours (3 guys for two days for a given activity).
Reports are very flexible and the report writers is much easier than Crystal reports.
If you subscribe to the full version of CostX this provides the most powerful feature of them all......Auto-Revisioning. This function will compare two sets of drawings, identify the changes on a color coded drawing, ask for you to approve the changes and then update your estimate and takeoff. You can even use this to produce custom print outs for RFI's show your design team what changed.
Your estimating workbooks are live-linked to your takeoff. As you make adjustments to your takeoff your estimate updates accordingly. The workbook has color coded text to hep your team understand whats behind your estimate; Black = manually input, Blue = rates linked to database, and Green = quantity linked to take-off.
Full integrated subcontractor comparison. We use to do this in excel to compare multiple bidders across every division.
This is also color coded for a streamlined review process; green = quote, blue = estimate, purple = plug, and orange = other.
Built in error checking notifies you if you forgot to normalize an item on your subcontractor comparison.
In the near future the software will be available online allowing you to use remotely.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
The restrictions in formatting, and sorting of information rendered, in a way, affects the reporting output.
At certain times of day, e-Builder traffic causes the loading of filtered searches to take a while. This is probably common regardless of the site or software used.
More complicated reporting has some limitation, though the program is highly efficient in assisting with simple format reports.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Simple, because have a used it for the past two years, so i'm very familiar with the particular aspects of its program that I need to accomplish my tasks.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Again, because our technical support is great. He doesn't always answer the phone but he definitely responds to emails fairly quickly. In addition, I like that he actually resolves an issue and I have yet to encounter the same issue twice. Actually, I haven't encountered many issues at all in the two years I have used the software.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
1. Set up the time to get training on the sytem before you go all in.
2. Listen, ask questions and actually practice using the tools and features while in class. It helps tremendously with becoming comfortable and remembering how things work.
3. Don't be afraid to mess up. They are helpful and will help resolve your issue in a timely manner
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
We have not compared other plans since the boss prefers this program from personal experience. But from using this program for 2 years I can see why we don't need to compare. Why fix something that isn't broken? It gets the job done, yes we might run into some issues but I feel like with all companies that can happen
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Easy to Collaborate Between the Team members. Saves a lot of work
Integrate with multiple types of data drawing which saves efforts in converting the design.
Bill of Quantity export can be done based on the Design section and can share with contractors for Quotes. Instead of just downloading the whole report and then editing for the required pack.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info