Dassault Systèmes S.A. is a French company and a world leader in the production of 3D design software, 3D digital mock-up and product lifecycle management (PLM) solutions.
$15
per month
Oracle Aconex
Score7 out of 10
N/A
Aconex is a cloud collaboration platform for the global construction industry which allows the user to quickly find what is needed with a single source of truth for communications, documents, processes, and models. Aconex was acquired and is now supported by Oracle since 2017.
N/A
Pricing
Enovia
Oracle Aconex
Editions & Modules
Enovia
$15.00
per month
No answers on this topic
Offerings
Pricing Offerings
Enovia
Oracle Aconex
Free Trial
No
No
Free/Freemium Version
No
No
Premium Consulting/Integration Services
No
No
Entry-level Setup Fee
No setup fee
No setup fee
Additional Details
—
—
More Pricing Information
Features
Enovia
Oracle Aconex
Reporting & Analytics
Comparison of Reporting & Analytics features of Enovia and Oracle Aconex
Feature
Enovia
-
Ratings
Oracle Aconex
5.0
4 Ratings
42% below category average
Dashboards
00 Ratings
5.04 Ratings
Standard reports
00 Ratings
5.04 Ratings
Custom reports
00 Ratings
5.04 Ratings
Construction Project & Field Management
Comparison of Construction Project & Field Management features of Enovia and Oracle Aconex
Very well suited for direct integration with CAD packages (Solidworks/ Auto desk Inventor or AutoCAD) and version control of CAD Model/Assemblies and Drawing files) and creating parts and document objects directly into Enovia and controlling their lifecycle from CAD Interface. Similarly, Enovia's Engineering central is already equipped with Industry standard ECR/ECO process which needs little customization for implementing Engineering Change management process. The hardest part in Enovia is controlling the disposition of released material for the downstream process in other ERP systems. For example, if a released material has gone for production or purchasing in ERP system/MRP system then dispositioning that material with Major revision (which may need manufacturing to stop the production due to faulty design) have no direct control to stop the downstream activities. Most cases its manual process to communicate with ERP team to for taking action. Similarly, revision of Documents (material Spec for example) linked to thousands of parts required special process (some time needs to schedule in the weekend).
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Large, Multi-Party Capital Projects Scenario: Major construction or infrastructure projects involving owners, designers, multiple contractors, subcontractors, and regulators. Why Aconex Fits: Provides a neutral, single source of truth across many independent organizations. Strong permissioning and data ownership model builds trust between parties. Scales well to very high document volumes and long project durations. Example Use: Design development and construction documentation for a multi-year infrastructure project with hundreds of external users.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
When a part/assembly has been released in Enovia and gone for production or downstream processing, Enovia doesn't have much control, hence, Enovia should come up with an easy controlling mechanism for various disposition of parts and seamless communication with an ERP or downstream process.
If a document is linked to thousands of materials then revising this document takes long time gets floated to the BOMs where the previous document versions are used. So, Enovia should have an efficient way to replace the floating process or another efficient mechanism for document revision processing.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Aconex's document control workflow allows for multiple versions of the same revision, enabling markups to be seen and document history as appropriate. This is on par with SOLIDWORKS EPDM, and is by far better than InEight's TeamBinder, as the originator and uploader of the document are able to change the version without the need for an administrator.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Easy learning curve for the users- Very user-friendly Interface for Engineering central make the users happy and easy to learn the BOM creation and Engineering change management process.
Time-saving - Seamless Creation and revision process of objects saves a huge amount of time compared to other systems.
Easy to copy existing business data and modify them as required.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Reductions in print costs alone (subcontractor bid process) paid completely for the use of the product. Further benefits to all project participants included process streamlining and 100% access to all project documentation (Drawings, Specifications, Contracts, Notices of Change, Change Orders etc.) from any online source including mobile devices. Benefits probably accounted for 150% of product cost.
Intangible benefits included reduced exposure to claims as a result of good (and agreed process tracking).
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info