ETAP, headquartered in Irvine, offers ETAP PS, their suite of power system modeling. simulation and optimization software, supporting power management, grid transmission analysis, and other electrical systems.
N/A
TurboCAD
Score9 out of 10
N/A
TurboCAD is 2D and 3D CAD software sold in many different editions, including Deluxe, Expert, and ProPlatinum.
N/A
Pricing
ETAP PS
TurboCAD
Editions & Modules
No answers on this topic
No answers on this topic
Offerings
Pricing Offerings
ETAP PS
TurboCAD
Free Trial
No
No
Free/Freemium Version
No
No
Premium Consulting/Integration Services
No
No
Entry-level Setup Fee
Optional
No setup fee
Additional Details
—
—
More Pricing Information
Features
ETAP PS
TurboCAD
Computer-Aided Design Software
Comparison of Computer-Aided Design Software features of ETAP PS and TurboCAD
ETAP is highly recommended for evaluating static conditions in electrical power systems, whether in high or medium complexity networks. For example, study of load flow, analysis of frequency harmonics.
On the other hand, I would not recommend ETAP for the simulation of highly complex control systems that require a dynamic analysis of the variables.
TurboCAD is well suited to a smaller budget, it is by no means the best there is but for the money, it fills the gap. Being an AutoCAD & DraftSight user I find the user interface a little old and the lack of common drafting industry shortcut keys a bit of a hindrance. However this product, TurboCAD gets the job done, other packages like DraftSight do not even come with an active 3D option on the cheaper end, standard license whereas TurboCAD does, even though it's a little clumsy to use.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
ETAP PS is really easy to use. When recreating the power system to be simulated, it is easy to obtain a result close to reality due to the multiple components offered in the interface. As for the electrical studies available, they are simple to execute and require really little configuration to make them work, always offering a wide variety of options to adjust the program to the simulation of the desired condition.
TurboCAD does all of the things we need it to do and some. The wide variety of options to create specificity in each of our projects is a large plus. The reason it was given a 9 is because the learning curve can be a little steep and sometimes certain processes are not as intuitive as they could be
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Sometimes when the program crashes for a random reason, it is difficult to find a direct solution to the problem. I think better documentation is needed for this type of case. Still, more and more people are sharing their work on the web, making it easier to orient yourself when these issues occur.
Simulink allows to analyze and simulate different variables with respect to time in an electric power system, but it is more focused on visual programming On the other hand, ETAP is better designed for static simulation of power systems, offering options and studies in a very more direct and easier to execute.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info