AutoCAD is a CAD product from Autodesk. It allows designers to work in 2D and 3D, and is available on Windows and Mac, but with extensive online collaboration tools.
$245
per month
Eco4Cloud Workload Consolidation
Score9.1 out of 10
Enterprise companies (1,001+ employees)
Eco4Cloud Workload Consolidation is a Virtual Infrastructure Optimization Solution designed to improve the economics of virtualized data centers with an intelligent software platform, which increases performances and decreases costs.
Eco4Cloud Workload Consolidation works on top of a virtualization platform, and uses the exposed API to connect to the platform and optimize the workload placement in a virtual farm in order to make it more…
Once again, for jobs/companies where you are doing a lot of design and modelling of tanks, pipework or filling machine or basic electronics its fantastic as a 3D and 2D modelling tool, however once again when it comes to testing these actual products in the real world, I feel like AutoCAD is let down by its clunky fitting and spec management and also in very limited in-house engineering simulations.
Eco4Cloud is well suited in VMware farms that have standard VM deployments, especially with small VMs, with nothing blocking vMotion and hardware fully compatible with IPMI 2.0 (minimum). It doesn't work well if many VMs are nodes in a Microsoft cluster because they would be unmovable and therefore their host would never be put in stand-by mode. If every host in the cluster has at least one guest VM that is a node of a Microsoft cluster, no host in the cluster will ever be put in stand-by mode.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
It consolidates workloads in VMware clusters using an algorithm that seems to work better than VMware DRS. It keeps headroom for workload peaks and to withstand the number of host failures set for the cluster in vCenter.
If the workload is very variable, Eco4Cloud will not continuously turn a host on and off but it will settle to keep the host running. It sort of "rightsizes" the cluster keeping only the right number of hosts running. This is another main difference when comparing Eco4Cloud with VMware DRS/DPM which strictly follows the workload and sometimes isn't fast enough in turning on the hosts when the workload is ramping-up.
To do a good job Eco4Cloud needs to analyze the hosts and the VMs. Therefore, the troubleshooting component of Eco4Cloud can figure out if there are problems in the configuration of the hosts (e.g. vMotion settings). It can also determine if a VM is stuck and can't vMotion (e.g. using the physical CD-ROM) or if it's oversized or undersized.
Something Eco4Cloud has and others don't is a technology named Smart Ballooning. With Smart Ballooning Eco4Cloud recovers unused RAM from the VMs and gives it back to the host way before the host goes over the 94% RAM threshold. This allows us to reach higher levels of overbooking.
User Interface Customisation: AutoCAD's user interface could benefit from more robust customisation options. Allowing users to rearrange toolbars, menus, and panels according to their specific workflows and preferences would enhance productivity.
Enhanced 3D Modeling Tools: While AutoCAD is capable of 3D modeling, it's not as intuitive or feature-rich as dedicated 3D modeling software. Streamlining the process and adding more advanced modeling tools would be a welcome improvement.
Enhanced Collaboration and Version Control: AutoCAD could improve its collaboration tools, such as real-time editing and version tracking, to facilitate smoother teamwork, especially in multi-disciplinary projects.
Intelligent Object Libraries: AutoCAD could benefit from an expanded and more intelligent library of standard objects and components. This would save time for designers who often have to create custom components from scratch.
Because rarely we [would] rather wait for a whole year to update, sometimes the new updates don't bring many new features and we are still ok with the current version. Also the change of interface is always something that takes time for every partner in the company to get comfortable with. So those are the main reasons we may want to keep the same version.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
It is very usable once you understand the program. I believe there is room for improvement in the 2D to 3D modeling capability. We have to use other apps to 3D model and that can be time consuming and sometimes AutoCAD doesn't transfer work that well between apps. They can improve there.
AutoCAD has the issue of crashing or slowing down the design procedure once a heavy design that includes several disciplines or multiple families/blocks is involved. Customer services gets the feedback from the crash reports but this issue seems like it has never been addressed in the software updates past several years.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
the implementation was realy easy , to set up our workstation we pay for the licenses we are about to use , there was a little bit of delay to get the payment processed to receive the serial but after that the install runs without any problem , so you can fell secure there will be not issue with the implementation.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
I use Revit far more than I use AutoCAD. AutoCAD is great for simple linework, but even then I will often create the lines in Revit and then export to AutoCAD for final touches and printing. AutoCAD is a bit easier for large-format prints, which is why I almost always end up using it after starting in Revit.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
We compared the consolidation feature and we obtained exactly the same amount of servers in stand-by. The main difference was that Eco4Cloud turned off the unneeded hosts in 2 days while VMTurbo Operations Manager required one day per host. This behavior is caused by the different algorithms implemented by these two products. Compared to Eco4Cloud, VMware DRS/DPM was very aggressive (we tried it in vSphere 5.0). We haven't tested it with vSphere 6 yet.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info