CATIA from Dassault Systemes is a 3D product modeling and design tool used across multiple industries.
N/A
Revit
Score 9.1 out of 10
N/A
Autodesk’s Revit is a Building Information Modelling (BIM) tool. It enables architectural, MEP, structural, and engineering design, and provides analysis to support iterative workflows
$350
per month
Pricing
CATIA
Revit
Editions & Modules
No answers on this topic
Monthly
$350
per month
1-Year
$2805
per year
3-Year
$8415
per 3 years
Offerings
Pricing Offerings
CATIA
Revit
Free Trial
No
Yes
Free/Freemium Version
No
No
Premium Consulting/Integration Services
No
No
Entry-level Setup Fee
No setup fee
No setup fee
Additional Details
—
Pricing available for monthly, annual, or 3-year subscriptions. Longer subscriptions offer greater discounts.
Revit is a more creative tool compared to others software like AutoCAD. More people can work simultaneously on Revit files but in AutoCAD only 1 person can work on 1 file. File management of Revit is good whereas in AutoCAD multiple AutoCAD files are created for the same 1 …
When it comes to modelling a product using multiple parts, CATIA becomes tedious. One need someone to sit with and learn with the experience from a frequent user. If switching from any other software to CATIA, it can be intimidating as learning curve is lengthy. For example, when working with complex shape in a knuckle joint, more steps are needed in part modelling. This cause part modelling lengthier and consume time more time, in comparison to SOLIDWORKS. However, CATIA is tremendously helpful in generating really complex features. Surface modelling is way easier when one know how to use it. It becomes really handy to make changes to the design later as well. The design history tree is also very well organized, which save time in later modifications
Revit is well suited for creating collaborative projects that are fully integrated into the design and construction document process. We work a lot with engineering firms who also use Revit and the program allows us to fully integrate and coordinate our models together to make sure that everything is correct. I can see where my electrical engineer has placed lighting into the model and same with my mechanical engineer and their HVAC equipment
3D Models - It's kind of a no brainer, but the key benefit of Revit is its ability to model in 3D. It's a somewhat complex modeling environment, however, it's not impossible to learn and I have seen users from a range of abilities to effectively model content in Revit.
Schedules - 3D is great, but the ability to quantify your geometry is contains valuable data if modeled correctly. If you model how you will build it, Revit has the ability to give very accurate schedules which includes quantities, and any data you would like to incorporate into your model.
Industry Standard - Revit is the industry standard. With that being said, it really help to use software that is compatible with other agencies for collaborative model review.
The software is pretty heavy, even with computers designed for heavy-duty loads, resulting in long wait times to load files and make changes, reducing productivity.
There are often several ways to draw certain things, but the object will have different capabilities based on the way it is drawn. This can be confusing when trying to use the object.
The way objects are drawn is not always user-friendly. This program would be difficult for someone to figure out on their own without having any Autodesk background.
There should be a better way to track changes in the model. Often times the architect will not share a model during construction to avoid sending changes that aren't finalized or complete.
We will almost certainly be renewing all of our current seats of Revit and will likely be adding seats as we look to get more and more of our staff trained and using Revit. The software is starting to become the standard for our projects as we move forward as more and more of our clients are requesting or accepting use of it
It is a professional environment, but far from easy and overly complex in many places. The system is often too deep in settings and overrides (see Visibility/Graphics in combination with linked files, filters, color overrides and view templates). I don't really like the dialog-in-dialog interface and its spartan looks. But it works well overall if you know what you are doing.
Revit seems to always be available when I need it. I have not experiences an outage. There are occasions where we need our internal IT department to trouble shoot a file on our Revit dedicated server and that sometimes causes a delay however that is not a software access issue
Revit is a fairly graphics heavy piece of software. It is powerful in its capabilities but as a result it takes a lot of the graphics card, the memory, etc. For all that it can do and the specs of my computer I find it pretty good from a performance standpoint
We got frequent updates on CATIA. There are lots of update notes. Also, there are lots of lots of videos online to solve the issues that you can stumble upon. It also has a built-in help manual, which helps occasionally. I have gotten my education through a physical class on CATIA, so there are opportunities like that as well.
Autodesk has always had a good support system in place. There is a massive user base for Revit, and there are thousands of forum threads and other discussions online about any and every problem that you could ever run into. For being such a large program with so many different options, there aren't many roadblocks or pitfalls that users can fall into.
The training was Revit Essentials and it was very beneficial. I would say that it is best to get the training right before you know you will be using Revit as learning the basis then applying what you learned immediately is the most effective and best value for your money.
The online training is hit or miss. I feel that its better to be live to be able to pace and ask questions to a live person as you are learning hwo to do things. Its not natural to learn Revit especially if you know AutoCAD so my suggestion is the live training
Implementing Revit as your main drafting software (i.e. moving to BIM from CAD) may be a tough decision if you have learned drafting. It is a different way to approach and think about developing a project. However, if you are able to adapt to a new way of thinking and get used to it by working through a few projects than it is as efficient as CAD in most areas in general and will also be both better/worse in some areas
You can create solid or 3D figures more easily and efficiently using Catia than in other programs or in specific AutoCAD. You can also create different pieces to later assemble them and thus create figures even more complex or in greater detail. In the same way, you can make 2D drawings without much complication.
Revit like AutoCAD can produce both a 3d model & 2 dimensional drawings such as plans, elevations & sections which are required for any design project to be communicated on paper for construction. But unlike AutoCAD, Revit's focus is to build a 3d model that contain smart information for construction. So for Revit the 2 dimensional drawings becomes a byproduct. In addition to the required drawings needed on paper to communicate the design, Revit offers so much more information in the model for all engineering disciplines.
While I am not directly involved with the deployment of Revit, it seems that our internal IT department has appreciated the ability to increase or decrease the number of seats. I have never had an issue with the deployment if and when needed, especially regarding the availability of a set
It's positive. It saves quite a bit of field time when used correctly, and lets us make sure we have proper room for all equipment and ductwork.
Helping minimize field 'thinking' time is an immediate add to the bottom line. 1 guy designing on the front side saves down time of 5-10 guys waiting in the field. Cost savings on labor is apparent.
Coordination time is also cut down, saving on office time. It's easy to spell out what your plan of attack is. All these savings directly add to bottom line profit by not expending labor.