Aconex is a cloud collaboration platform for the global construction industry which allows the user to quickly find what is needed with a single source of truth for communications, documents, processes, and models. Aconex was acquired and is now supported by Oracle since 2017.
N/A
PlanSwift, by ConstructConnect
Score3 out of 10
N/A
PlanSwift is a quantity takeoff software for construction estimating. It features a drag-and-drop interface and automatically calculates material and labor estimations in exportable formats.
PlanSwift was acquired by ConstructConnect in the middle of 2018.
$1,595
per installation
Pricing
Oracle Aconex
PlanSwift, by ConstructConnect
Editions & Modules
No answers on this topic
Standard
$1,595
per installation
Offerings
Pricing Offerings
Oracle Aconex
PlanSwift, by ConstructConnect
Free Trial
No
No
Free/Freemium Version
No
No
Premium Consulting/Integration Services
No
No
Entry-level Setup Fee
No setup fee
No setup fee
Additional Details
—
—
More Pricing Information
Features
Oracle Aconex
PlanSwift, by ConstructConnect
Reporting & Analytics
Comparison of Reporting & Analytics features of Oracle Aconex and PlanSwift, by ConstructConnect
Feature
Oracle Aconex
5.0
4 Ratings
42% below category average
PlanSwift, by ConstructConnect
-
Ratings
Dashboards
5.04 Ratings
00 Ratings
Standard reports
5.04 Ratings
00 Ratings
Custom reports
5.04 Ratings
00 Ratings
Construction Project & Field Management
Comparison of Construction Project & Field Management features of Oracle Aconex and PlanSwift, by ConstructConnect
Large, Multi-Party Capital Projects Scenario: Major construction or infrastructure projects involving owners, designers, multiple contractors, subcontractors, and regulators. Why Aconex Fits: Provides a neutral, single source of truth across many independent organizations. Strong permissioning and data ownership model builds trust between parties. Scales well to very high document volumes and long project durations. Example Use: Design development and construction documentation for a multi-year infrastructure project with hundreds of external users.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
I use PlanSwift for all my projects - it has just cut my time by a major percentage when it comes to quantifying a blueprint. At times there are funky areas, which are just hard to calculate on paper. It also has a great tool for scaling according to the dimensions, so if a drawing is missing a scale, you can always allot a scale by giving directions and then marking the points. I use this tool to check the scale as well - sometimes the drawings say something but the scale if off and you are left with an incorrect take-off. The dimension tool is a good way to check that. We don't use it much for pricing purposes though, we have found other software which are more robust when it comes to estimation, but we can see using PlanSwift for pricing sometime in the future.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
I have called once needing support. I was asking about the "compare" tool to compare different versions. They told be about their desktop app and I downloaded. They answered quickly, you could understand them, and they took care of my question
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Aconex's document control workflow allows for multiple versions of the same revision, enabling markups to be seen and document history as appropriate. This is on par with SOLIDWORKS EPDM, and is by far better than InEight's TeamBinder, as the originator and uploader of the document are able to change the version without the need for an administrator.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Bluebeam is amazing and can accomplish any take-off needs, but you will spend much more time creating your conditions and take off items. It is not as user-friendly as PlanSwift. OST (On screen takeoff). This product is by far better than PlanSwift, as it is amazingly easy to use. However, it is much more expensive. Cloud-based takeoff software -- this kind of software is difficult for me to use because of how slow the pages load and navigate. It's hard to beat that from PlanSwift or OST.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Reductions in print costs alone (subcontractor bid process) paid completely for the use of the product. Further benefits to all project participants included process streamlining and 100% access to all project documentation (Drawings, Specifications, Contracts, Notices of Change, Change Orders etc.) from any online source including mobile devices. Benefits probably accounted for 150% of product cost.
Intangible benefits included reduced exposure to claims as a result of good (and agreed process tracking).
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info