Autodesk Build vs. Oracle Primavera Submittal Exchange

Overview
ProductRatingMost Used ByProduct SummaryStarting Price
Autodesk Build
Score 8.0 out of 10
N/A
Autodesk Build, based on the former PlanGrid, is construction productivity software. It includes tools to collaborate, collect, and manage project information throughout the project’s construction and operations lifespan. It enables document centralization and tracking.
$39
user per month
Oracle Primavera Submittal Exchange
Score 6.0 out of 10
N/A
Oracle Primavera Submittal Exchange, part of the Primavera product suite, is offered as a secure, online system for electronically exchanging, reviewing, and archiving design and construction project documentation.N/A
Pricing
Autodesk BuildOracle Primavera Submittal Exchange
Editions & Modules
Nailgun
$39
user per month
Dozer
$59
user per month
Crane
$139
user per month
No answers on this topic
Offerings
Pricing Offerings
Autodesk BuildOracle Primavera Submittal Exchange
Free Trial
YesNo
Free/Freemium Version
NoNo
Premium Consulting/Integration Services
YesNo
Entry-level Setup FeeNo setup feeNo setup fee
Additional Details
More Pricing Information
Community Pulse
Autodesk BuildOracle Primavera Submittal Exchange
Considered Both Products
Autodesk Build
Chose Autodesk Build
PlanGrid is very similar to Procore but offers a slightly more straightforward user interface and seems not to be loaded with extra options that rarely would get used like Procore. PlanGrid is a much smoother software than Submittal Exchange or CMiC due to that same interface. …
Oracle Primavera Submittal Exchange

No answer on this topic

Features
Autodesk BuildOracle Primavera Submittal Exchange
Construction Project & Field Management
Comparison of Construction Project & Field Management features of Product A and Product B
Autodesk Build
6.5
58 Ratings
13% below category average
Oracle Primavera Submittal Exchange
8.1
1 Ratings
9% above category average
Plan distribution & viewing7.057 Ratings10.01 Ratings
Plan markups & sharing6.057 Ratings4.01 Ratings
Issue tracking & punchlists5.052 Ratings6.01 Ratings
Photo documentation9.049 Ratings10.01 Ratings
Jobsite reports9.037 Ratings7.01 Ratings
Document sharing8.056 Ratings9.01 Ratings
RFI tools5.039 Ratings10.01 Ratings
Collaboration & approvals8.043 Ratings10.01 Ratings
As-built drawings5.043 Ratings6.01 Ratings
Mobile app3.055 Ratings00 Ratings
Submittal design and management00 Ratings10.01 Ratings
Checklists00 Ratings6.01 Ratings
Meeting Minutes00 Ratings9.01 Ratings
Specifications00 Ratings8.01 Ratings
Change orders00 Ratings8.01 Ratings
Human Resource Management
Comparison of Human Resource Management features of Product A and Product B
Autodesk Build
-
Ratings
Oracle Primavera Submittal Exchange
8.2
1 Ratings
10% above category average
Employee demographic data00 Ratings7.01 Ratings
Employment history00 Ratings8.01 Ratings
Job profiles and administration00 Ratings10.01 Ratings
Organizational charting00 Ratings9.01 Ratings
Organization and location management00 Ratings7.01 Ratings
Compliance data (COBRA, OSHA, etc.)00 Ratings8.01 Ratings
Payroll Management
Comparison of Payroll Management features of Product A and Product B
Autodesk Build
-
Ratings
Oracle Primavera Submittal Exchange
8.6
1 Ratings
17% above category average
Support for external payroll vendors00 Ratings8.01 Ratings
Off-cycle/On-Demand payment00 Ratings8.01 Ratings
Benefit plan administration00 Ratings9.01 Ratings
Direct deposit files00 Ratings10.01 Ratings
Reimbursement management00 Ratings8.01 Ratings
Reporting & Analytics
Comparison of Reporting & Analytics features of Product A and Product B
Autodesk Build
-
Ratings
Oracle Primavera Submittal Exchange
9.0
1 Ratings
15% above category average
Dashboards00 Ratings10.01 Ratings
Standard reports00 Ratings8.01 Ratings
Custom reports00 Ratings9.01 Ratings
Data exportability00 Ratings9.01 Ratings
Estimating
Comparison of Estimating features of Product A and Product B
Autodesk Build
-
Ratings
Oracle Primavera Submittal Exchange
7.8
1 Ratings
1% above category average
Takeoff tools00 Ratings7.01 Ratings
Job costing00 Ratings8.01 Ratings
Cost databases00 Ratings8.01 Ratings
Cost calculator00 Ratings8.01 Ratings
Best Alternatives
Autodesk BuildOracle Primavera Submittal Exchange
Small Businesses
FollowUp CRM
FollowUp CRM
Score 10.0 out of 10
FollowUp CRM
FollowUp CRM
Score 10.0 out of 10
Medium-sized Companies
InEight
InEight
Score 8.5 out of 10
InEight
InEight
Score 8.5 out of 10
Enterprises
InEight
InEight
Score 8.5 out of 10
InEight
InEight
Score 8.5 out of 10
All AlternativesView all alternativesView all alternatives
User Ratings
Autodesk BuildOracle Primavera Submittal Exchange
Likelihood to Recommend
7.0
(70 ratings)
8.0
(1 ratings)
Likelihood to Renew
10.0
(1 ratings)
-
(0 ratings)
Usability
5.0
(2 ratings)
-
(0 ratings)
Support Rating
9.0
(52 ratings)
-
(0 ratings)
User Testimonials
Autodesk BuildOracle Primavera Submittal Exchange
Likelihood to Recommend
Autodesk
PlanGrid performs really well in all aspects of construction from the general to the sub/trade. The platform distributes and communicates project documentation in an extremely user-friendly manner. As with most software, it is cheaper the larger the scale of the project. In situations where the project is relatively small, and the trade contracts are also of relatively low dollar value, the product can be cost-prohibitive.
Read full review
Oracle
[Oracle Primavera Submittal Exchange] is very easy to train new users on it and have everyone on the same page. The daily reminder emails can be a pain but if there are documents needed from a trade it is a great way to remind the the it is in their ball of court to act accordingly and get the documents uploaded because there might be other trades waiting on them.
Read full review
Pros
Autodesk
  • Plangrid is the best SaaS I have seen for ease of uploading construction plans and automated organization of those plans.
  • For companies that are not using other products for mobile access, the Plangrid mobile apps are perfect to allow people on and off site to share and collaborate in many phases of construction project documentation.
  • Plangrid has a very responsive technical support team (although it is pretty much email only).
  • Plangrid's website layout is easy to use and understand and allows new users to jump right in and do basic to moderate tasks without little training.
Read full review
Oracle
  • It is very easy to navigate the site and find what you are looking for.
  • They have a great support team.
  • It is easy to remind different trades via notification of there are documents or submittals needed for them.
Read full review
Cons
Autodesk
  • The photo attachment process is a bit complicated. In ProCore (another similar software I've used), you can upload photos directly into RFIs for your reference, or into e-mails. For PlanGrid, you have to first upload the photo into the documents tab, then link them into the RFI. It's not intuitive and can add confusion to the documents tab.
  • Photos can't be directly uploaded. Between different devices and colleagues, it's possible you'll get an important photo outside of the PlanGrid photo capture feature within its app. Again, it's complicated for users to use.
  • In their new drawings viewer, the icons for actions do not have icons available. I had to use them all in order to understand what they meant, and I'm fairly tech savvy. I'm not sure if a new person to PlanGrid will pick up on each icon's abilities very easily.
  • There's no all-in-one solution in CM, but PlanGrid is fairly barebones, and I don't believe it has any ability to connect to other software. There's no ability to take meeting munites; you can hack the field reports feature to accomplish this, but it's clear that was not the intent of the designers.
Read full review
Oracle
  • The daily reminder emails can quickly keep filling up your inbox.
  • I can't think of anything else because it is very easy to use.
Read full review
Likelihood to Renew
Autodesk
We are at the point where we have shown our teams what is possible with this software. We cannot take it away and go back to the way we used to do things. I think that they would push back on us to give them access to something electronic. It is a good program that we will continue to use
Read full review
Oracle
No answers on this topic
Usability
Autodesk
Hard to get the hang of this software, but with time it become very repetitive and easier to navigate. I have used this software for over a year now and the constant updates by Autodesk have made the software better and better to use at work. This allows me to use this tool more effectively
Read full review
Oracle
No answers on this topic
Support Rating
Autodesk
Online chat during business hours is extremely helpful. The Plangrid staff has gone above and beyond many times to help us. One time they even offered to completely rebuild our 900+ sheet project so I could slip sheet a few old drawing revisions! This undoubtedly would have taken hours on Plangrid's end. They are always responsive and are continually improving, listening to user feedback.
Read full review
Oracle
No answers on this topic
Alternatives Considered
Autodesk
Plangrid, while not serving the external document distribution function, is unrivaled for internal document distribution and sharing in the construction industry. The speed at which documents are navigatable, the ability to download your projects for viewing without an internet connection, and the document mark-up and photo tools place it head and shoulders above the competition.
Read full review
Oracle
Procore is a bit more expensive but I think it brings more to the table.
Read full review
Return on Investment
Autodesk
  • It helped us "wow" a joint commission survey in 2016 and have a successful survey because he loved how we could access plans on an iPad, check suite sizes, and didn't have to carry around huge, heavy sets of life safety plans.
Read full review
Oracle
  • It has allowed us to manage our submittals better and get the back in a timely manner to schedule projects accordingly and keep the flow going.
  • It can be a little time consuming to get the project data entered but if done right, it is worth it.
Read full review
ScreenShots

Autodesk Build Screenshots

Screenshot of No confusing folders - all your plans at your fingertips.Screenshot of Easy overlay to visually detect changes or clashes.Screenshot of Track issues directly on the plan, including descriptions, photos, cost, and schedule impacts.Screenshot of Mark up plans for instant communication between field and office.Screenshot of Attach any kind of construction documents to your plans, including 360 photos.Screenshot of Track, review, and submit all your field reports on a mobile device.