Oracle Primavera Submittal Exchange, part of the Primavera product suite, is offered as a secure, online system for electronically exchanging, reviewing, and archiving design and construction project documentation.
N/A
Revit
Score8.9 out of 10
N/A
Autodesk’s Revit is a Building Information Modelling (BIM) tool. It enables architectural, MEP, structural, and engineering design, and provides analysis to support iterative workflows
$350
per month
Simpro
Score8.4 out of 10
N/A
Simpro, headquartered in Brisbane, provides business management software for the trades and services industry. The solution combines field service management with asset tracking and maintenance, project management features with resource scheduling, and invoicing. For enterprises, Simpro helps manage business complexity such as franchises, multiple companies or multiple locations with a tailored Simpro framework that aims to handle complexity while maintaining the simplicity of working with one…
N/A
Pricing
Oracle Primavera Submittal Exchange
Revit
Simpro
Editions & Modules
No answers on this topic
Monthly
$350
per month
1-Year
$2805
per year
3-Year
$8415
per 3 years
No answers on this topic
Offerings
Pricing Offerings
Oracle Primavera Submittal Exchange
Revit
Simpro
Free Trial
No
Yes
No
Free/Freemium Version
No
No
No
Premium Consulting/Integration Services
No
No
Yes
Entry-level Setup Fee
No setup fee
No setup fee
No setup fee
Additional Details
—
Pricing available for monthly, annual, or 3-year subscriptions. Longer subscriptions offer greater discounts.
Simpro uses quote-based pricing tailored to each business and its requirements. A personalized demo and consultation are available. Simpro does not offer a self-service free trial or free version. Pricing varies based on the selected platform capabilities, add-ons, onboarding, training, and professional services.
[Oracle Primavera Submittal Exchange] is very easy to train new users on it and have everyone on the same page. The daily reminder emails can be a pain but if there are documents needed from a trade it is a great way to remind the the it is in their ball of court to act accordingly and get the documents uploaded because there might be other trades waiting on them.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Revit is very well suited to creating designs and construction documents for standard buildings. Buildings that need to utilize phasing in their construction process are also well suited to this software. Revit is not as well suited to buildings that have irregular shapes or components that need to be highly detailed.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Simpro is well suited for job and team management, tracking inventory and the workflow is very logical. The mobile app for our field technicians works very well to clock on and off and then being in a position to report to a customer based on factual information has made invoicing a breeze! Reporting can be a bit frustrating especially on materials used on different cost centre numbers as you can only specify a job number, but not a cost centre number.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Revit allows users to create real buildings and is very much rooted in making functional buildings.
Revit allows users to collaborate both within their own firms and with other types of firms as well. This is particularly useful for coordinating buildings between architecture and engineering firms.
Revit integrates fairly well with other programs such as AutoCAD and Sketchup. This allows us to bring in elements modeled in other programs into our revit models.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Versioning - Revit is not backwards compatible. This creates issues if you are working with people who are using older versions as you cannot save to a previous version. I understand why this is and I do not see this ever changing, however, Its very annoying.
Autodesk - They are the 800 pound gorilla in the industry. The lack of competition inhibits development and it seems Autodesk has put more effort into its BIM 360 platform and Revit development has suffered because of it. I would like to see better competition so Autodesk would step up its game.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
We will almost certainly be renewing all of our current seats of Revit and will likely be adding seats as we look to get more and more of our staff trained and using Revit. The software is starting to become the standard for our projects as we move forward as more and more of our clients are requesting or accepting use of it
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
The interface if fairly intuitive and the graphic display of many forms and reports is much better than Procore. I started using Submittal Exchange about 17 years ago. Primavera has worked to add features, but I have not been able to integrate them all into my workflow. I still use the original features more than the new ones.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
It is a professional environment, but far from easy and overly complex in many places. The system is often too deep in settings and overrides (see Visibility/Graphics in combination with linked files, filters, color overrides and view templates). I don't really like the dialog-in-dialog interface and its spartan looks. But it works well overall if you know what you are doing.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
As mentioned before, materials reporting could use some work as one cannot report by cost centre number, only by job number. It makes it difficult with large jobs with multiple cost centre numbers to easily extract information for reporting. Other than that the system is user friendly and easy to understand.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Revit seems to always be available when I need it. I have not experiences an outage. There are occasions where we need our internal IT department to trouble shoot a file on our Revit dedicated server and that sometimes causes a delay however that is not a software access issue
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Revit is a fairly graphics heavy piece of software. It is powerful in its capabilities but as a result it takes a lot of the graphics card, the memory, etc. For all that it can do and the specs of my computer I find it pretty good from a performance standpoint
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Autodesk has always had a good support system in place. There is a massive user base for Revit, and there are thousands of forum threads and other discussions online about any and every problem that you could ever run into. For being such a large program with so many different options, there aren't many roadblocks or pitfalls that users can fall into.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
It is a great option for solar project management. It needs some improvements for real-time one-page reports, inventory management, scheduling and custom views. I believe these will come because they listen to their customers. I would also like to see some better training and not be expected to pay out of pocket for it.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
The training was Revit Essentials and it was very beneficial. I would say that it is best to get the training right before you know you will be using Revit as learning the basis then applying what you learned immediately is the most effective and best value for your money.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
The online training is hit or miss. I feel that its better to be live to be able to pace and ask questions to a live person as you are learning hwo to do things. Its not natural to learn Revit especially if you know AutoCAD so my suggestion is the live training
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Implementing Revit as your main drafting software (i.e. moving to BIM from CAD) may be a tough decision if you have learned drafting. It is a different way to approach and think about developing a project. However, if you are able to adapt to a new way of thinking and get used to it by working through a few projects than it is as efficient as CAD in most areas in general and will also be both better/worse in some areas
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
My company uses Submittal Exchange when required by the client. The cost is too expensive for us to select as an enterprise because other clients require that we use different software.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Revit is used primarily for creation of contract documents and documents that need to be used to build in the field. Sketch Up is great for a quick concept sketch, but lacks the details that Revit has which are needed to construct. AutoCAD is a great tool for details as well, but does not have as many building capabilities as Revit.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
monday.com was easier to set up and you can create boards with loads of subtasks which helps manage a project. Also, the ability to integrate with google was much better as we could link it to the calendar and also store documents that the engineers could see easier onsite. Overall we could make monday.com work better for our business based on how we are set up but simPRO will be great for other businesses with more specific needs.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
While I am not directly involved with the deployment of Revit, it seems that our internal IT department has appreciated the ability to increase or decrease the number of seats. I have never had an issue with the deployment if and when needed, especially regarding the availability of a set
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Though implementation of Revit is usually front heavy which means a lot of effort is put in at the front end of the project, the return of investment towards the remainder of the project is really good. All the effort in decisions made at the beginning of the project pays off with Revit incorporating all the building information in the model so the team can glean from this throughout the life of the project is a major plus.
A major negative is the many false assumptions that comes with using Revit on a project. Just like any other computer application, Revit is only a tool. It's only as good as the operators who implement this tool. Revit is not a cureall for fixing all the problems that still can come out throughout the life of a design & construction project.
A major positive for our office involving the use of Revit is the ability for our staff from multiple offices to work on the same project central file. We don't need to maintain an expensive server. With the addition of Collaboration for Revit the entire project can be stored in the cloud for our staff to access and complete the project faster than ever.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info