TrustRadius: an HG Insights company

CMiC Construction Platform vs. Oracle Primavera Submittal Exchange

Save this comparison

Save this comparison

Contact about CMiC Construction Platform

Please fill out the form below to get in touch.

CMiC

Connect with CMiC

What are you interested in?

Already have an account?

You hereby consent to have TrustRadius share the information supplied on this form with CMiC so that CMiC and TrustRadius may contact you in regard to the information requested.

Add Product

Recommended Comparisons

    Overview
    ProductRatingMost Used ByProduct SummaryStarting Price

    CMiC Construction Platform

    Score8.5 out of 10
    Mid-Size Companies (51-1,000 employees)
    CMiC Project Management is a construction project collaboration and management solution. It centralizes project-related communications and documents onto one platform, and connects the job site with the back-end office.N/A

    Oracle Primavera Submittal Exchange

    Score6 out of 10
    N/AOracle Primavera Submittal Exchange, part of the Primavera product suite, is offered as a secure, online system for electronically exchanging, reviewing, and archiving design and construction project documentation.N/A
    Pricing
    CMiC Construction PlatformOracle Primavera Submittal Exchange
    Editions & Modules
    No answers on this topic
    No answers on this topic
    Offerings
    Pricing Offerings
    CMiC Construction PlatformOracle Primavera Submittal Exchange
    Free Trial
    NoNo
    Free/Freemium Version
    NoNo
    Premium Consulting/Integration Services
    NoNo
    Entry-level Setup FeeNo setup feeNo setup fee
    Additional Details——
    More Pricing Information
    Community Pulse
    CMiC Construction PlatformOracle Primavera Submittal Exchange
    Considered Both Products
    CMiC
    Chose CMiC Construction Platform
    It's significantly worse, even Fieldwire was better and it's a pretty basic system.
    Incentivized
    Chose CMiC Construction Platform
    The look and feel of CMiC is very similar to PlanGrid but when you get into the nitty-gritty of using CMiC for drawing management, it's lacking features our employees have pointed out. Submittal Exchange is much cleaner for submittal management. The interface is better. The …
    Incentivized
    Chose CMiC Construction Platform
    Worse than all 3. PlanGrid: Smoother use than CMiC. The way it is formatted and shows the plans in order is the best. CMiC shows plans in the order they were uploaded instead of plan order (A100, A101, etc.). Procore: Same reason as PlanGrid. It just feels as though CMiC's plan …
    Incentivized
    Chose CMiC Construction Platform
    I found the two to be very similar. I was in a project coordinator position while using Primavera and was a lot more hands-on with it. I found the speed of primavera to be comparable, or even slower than CMIC. CMIC vs Oracle; the functions were relatively the same as there is …
    Incentivized
    Oracle
    No answer on this topic
    Key User Insights
    Would buy again
    72%
    Would buy again
    85 Answers
    No answers on this topic
    Delivers good value for the price
    81%
    Delivers good value for the price
    64 Answers
    No answers on this topic
    Happy with the feature set
    81%
    Happy with the feature set
    96 Answers
    No answers on this topic
    Lived up to sales and marketing promises
    52%
    Lived up to sales and marketing promises
    26 Answers
    No answers on this topic
    Implementation went as expected
    46%
    Implementation went as expected
    32 Answers
    No answers on this topic
    Features
    CMiC Construction PlatformOracle Primavera Submittal Exchange
    Human Resource Management
    Comparison of Human Resource Management features of CMiC Construction Platform and Oracle Primavera Submittal Exchange
    Feature
    CMiC Construction Platform
    7.8
    34 Ratings
    12% above category average
    Oracle Primavera Submittal Exchange
    1.9
    2 Ratings
    114% below category average
    Employee demographic data7.023 Ratings1.02 Ratings
    Employment history8.728 Ratings1.02 Ratings
    Job profiles and administration7.723 Ratings1.02 Ratings
    Workflow for transfers, promotions, pay raises, etc.7.422 Ratings1.01 Ratings
    Organizational charting7.717 Ratings1.02 Ratings
    Organization and location management7.717 Ratings7.01 Ratings
    Compliance data (COBRA, OSHA, etc.)8.322 Ratings1.02 Ratings
    Payroll Management
    Comparison of Payroll Management features of CMiC Construction Platform and Oracle Primavera Submittal Exchange
    Feature
    CMiC Construction Platform
    8.1
    30 Ratings
    21% above category average
    Oracle Primavera Submittal Exchange
    1.0
    2 Ratings
    147% below category average
    Pay calculation8.830 Ratings1.01 Ratings
    Support for external payroll vendors6.819 Ratings1.02 Ratings
    Off-cycle/On-Demand payment7.520 Ratings1.02 Ratings
    Benefit plan administration8.020 Ratings1.02 Ratings
    Direct deposit files9.926 Ratings1.02 Ratings
    Salary revision and increment management8.025 Ratings1.01 Ratings
    Reimbursement management7.719 Ratings1.02 Ratings
    Asset Management
    Comparison of Asset Management features of CMiC Construction Platform and Oracle Primavera Submittal Exchange
    Feature
    CMiC Construction Platform
    9.7
    24 Ratings
    35% above category average
    Oracle Primavera Submittal Exchange
    1.0
    1 Ratings
    149% below category average
    Tracking of all physical assets9.724 Ratings1.01 Ratings
    Reporting & Analytics
    Comparison of Reporting & Analytics features of CMiC Construction Platform and Oracle Primavera Submittal Exchange
    Feature
    CMiC Construction Platform
    8.7
    62 Ratings
    12% above category average
    Oracle Primavera Submittal Exchange
    5.5
    2 Ratings
    34% below category average
    Dashboards9.649 Ratings5.02 Ratings
    Standard reports7.861 Ratings6.02 Ratings
    Custom reports8.051 Ratings6.02 Ratings
    Data exportability9.458 Ratings5.02 Ratings
    Construction Project & Field Management
    Comparison of Construction Project & Field Management features of CMiC Construction Platform and Oracle Primavera Submittal Exchange
    Feature
    CMiC Construction Platform
    7.9
    111 Ratings
    3% above category average
    Oracle Primavera Submittal Exchange
    6.7
    2 Ratings
    13% below category average
    Plan distribution & viewing7.572 Ratings9.02 Ratings
    Plan markups & sharing7.568 Ratings7.02 Ratings
    Issue tracking & punchlists8.286 Ratings6.02 Ratings
    Photo documentation7.582 Ratings6.02 Ratings
    Jobsite reports8.593 Ratings7.02 Ratings
    Document sharing7.894 Ratings9.02 Ratings
    RFI tools8.095 Ratings7.02 Ratings
    Collaboration & approvals6.299 Ratings8.02 Ratings
    As-built drawings7.859 Ratings6.02 Ratings
    Mobile app8.069 Ratings6.01 Ratings
    Submittal design and management8.290 Ratings7.02 Ratings
    Checklists7.051 Ratings6.02 Ratings
    Meeting Minutes8.056 Ratings6.02 Ratings
    Specifications8.544 Ratings5.02 Ratings
    Change orders9.965 Ratings6.02 Ratings
    Estimating
    Comparison of Estimating features of CMiC Construction Platform and Oracle Primavera Submittal Exchange
    Feature
    CMiC Construction Platform
    8.9
    61 Ratings
    14% above category average
    Oracle Primavera Submittal Exchange
    1.6
    2 Ratings
    131% below category average
    Takeoff tools8.922 Ratings4.02 Ratings
    Job costing9.257 Ratings1.02 Ratings
    Cost databases9.347 Ratings1.02 Ratings
    Cost calculator8.235 Ratings1.02 Ratings
    Bid creation8.930 Ratings1.01 Ratings
    Best Alternatives
    CMiC Construction PlatformOracle Primavera Submittal Exchange
    Small Businesses
    Autodesk Forma Build
    Score9.6 out of 10
    Autodesk Forma Build
    Score9.6 out of 10
    Medium-sized Companies
    Autodesk Forma Build
    Score9.6 out of 10
    Autodesk Forma Build
    Score9.6 out of 10
    Enterprises
    Autodesk Forma Design Collaborate
    Score8.3 out of 10
    Autodesk Forma Design Collaborate
    Score8.3 out of 10
    All AlternativesView all alternativesView all alternatives
    User Ratings
    CMiC Construction PlatformOracle Primavera Submittal Exchange
    Likelihood to Recommend
    8.4
    (122 ratings)
    6.0
    (2 ratings)
    Likelihood to Renew
    10.0
    (8 ratings)
    -
    (0 ratings)
    Usability
    7.4
    (11 ratings)
    7.0
    (1 ratings)
    Availability
    10.0
    (2 ratings)
    -
    (0 ratings)
    Performance
    8.0
    (2 ratings)
    -
    (0 ratings)
    Support Rating
    10.0
    (97 ratings)
    -
    (0 ratings)
    In-Person Training
    7.5
    (2 ratings)
    -
    (0 ratings)
    Online Training
    8.0
    (1 ratings)
    -
    (0 ratings)
    Implementation Rating
    10.0
    (6 ratings)
    -
    (0 ratings)
    Configurability
    9.0
    (2 ratings)
    -
    (0 ratings)
    Ease of integration
    9.0
    (1 ratings)
    -
    (0 ratings)
    Product Scalability
    10.0
    (2 ratings)
    -
    (0 ratings)
    Vendor post-sale
    9.0
    (2 ratings)
    -
    (0 ratings)
    Vendor pre-sale
    9.0
    (2 ratings)
    -
    (0 ratings)
    User Testimonials
    CMiC Construction PlatformOracle Primavera Submittal Exchange
    Likelihood to Recommend
    CMiC
    CMiC is a robust platform best suited for large companies with resources for implementation and management of the program. One analogy is CMiC is like a droid phone where the user must decide how to use all the features of the program (as opposed to an iPhone where most configuration decisions are made for the user). Smaller companies with limited resources can struggle with CMiC both with the expense and configuration.
    Incentivized
    Read full review
    Oracle
    [Oracle Primavera Submittal Exchange] is very easy to train new users on it and have everyone on the same page. The daily reminder emails can be a pain but if there are documents needed from a trade it is a great way to remind the the it is in their ball of court to act accordingly and get the documents uploaded because there might be other trades waiting on them.
    Incentivized
    Read full review
    Pros
    CMiC
    • The user interface is similar to that of other project management software applications so folks in our company that had previously used other applications have been able to switch over fairly easily.
    • I really like the software and it was much less expensive than other applications.
    • I like the mobile application so that our superintendents can view the documentation on their phones.
    • I really like the punch list capability mobile field, however, we have a hard time getting our superintendents to use it for some reason.
    Incentivized
    Read full review
    Oracle
    • It is very easy to navigate the site and find what you are looking for.
    • They have a great support team.
    • It is easy to remind different trades via notification of there are documents or submittals needed for them.
    Incentivized
    Read full review
    Cons
    CMiC
    • Needs to be more user friendly on the mobile side of the platform. Ease of use is key here.
    • There is not much instruction or support in standing up some programs like deploying ECM for outlook, making Collaboration Gateway work, or setting up the system for getting Plans available on the mobile devices.
    • Security configuration is extremely detailed and spread throughout the system. It is extremely hard to make adjustments to a person's security unless you know exactly where to look, which requires years of experience but shouldn't.
    Incentivized
    Read full review
    Oracle
    • The daily reminder emails can quickly keep filling up your inbox.
    • I can't think of anything else because it is very easy to use.
    Incentivized
    Read full review
    Likelihood to Renew
    CMiC
    This is a platform that would continue to be in the best interest for our company. I just hope that CMiC support removes the gaps between the enhancements that they create to better the system to what they currently have
    Incentivized
    Read full review
    Oracle
    No answers on this topic
    Usability
    CMiC
    It takes a lot of learning to understand the platform. There are training videos but they are often not detailed enough. Screens are inconsistent. Some screens you can upload imports, others you have to manually enter the data. Finding errors requires lots of patience and usually opening a support case
    Incentivized
    Read full review
    Oracle
    The interface if fairly intuitive and the graphic display of many forms and reports is much better than Procore. I started using Submittal Exchange about 17 years ago. Primavera has worked to add features, but I have not been able to integrate them all into my workflow. I still use the original features more than the new ones.
    Incentivized
    Read full review
    Reliability and Availability
    CMiC
    Sometimes since this is a cloud based product the system can become slow but we haven’t had any issues of availability without CMiC first letting us know it would be down
    Incentivized
    Read full review
    Oracle
    No answers on this topic
    Performance
    CMiC
    Reports are pretty shown to run but general pages typically load pretty quick.
    Incentivized
    Read full review
    Oracle
    No answers on this topic
    Support Rating
    CMiC
    The support team [has] been in touch with our deployment team and has given them effective guidance up to completion. It has helped us in [the] best methods of resource allocation and secure record-keeping process. We have tracked all our billing information and made the right payments with documentation and avoided [unnecessary losses]. [The] support team has [to] lead our teams to the right channels and empowering our team with the right skills for maximum production.
    Incentivized
    Read full review
    Oracle
    No answers on this topic
    In-Person Training
    CMiC
    The training was on system functions and not really how best to use it for our business. It would have been nice to be provided recommendations for use rather than just a blank slate of functionality.
    Incentivized
    Read full review
    Oracle
    No answers on this topic
    Online Training
    CMiC
    I felt the training was good and the trainers knew the software.
    Incentivized
    Read full review
    Oracle
    No answers on this topic
    Implementation Rating
    CMiC
    Lots of confusion between sales and implementation regarding what was included and not included...the security encountered a "bug" and made it extremely difficult to set up roles and individual responsibilities
    Incentivized
    Read full review
    Oracle
    No answers on this topic
    Alternatives Considered
    CMiC
    CMiC Construction Platform is the best price point in the market. Others are revenue-based billings, and the annual fees reflect as such. CMiC Construction Platform support staff is generally amazing and offers real-time support on critical issues. The imaging and workflow functions are real-time savers. CMiC Construction Platform is generally a smaller and in touch organization that treats your team like their own and stays with you after the purchase.
    Incentivized
    Read full review
    Oracle
    My company uses Submittal Exchange when required by the client. The cost is too expensive for us to select as an enterprise because other clients require that we use different software.
    Incentivized
    Read full review
    Scalability
    CMiC
    CMiC has several key features that can either work together or independently depending on your companies needs.
    Incentivized
    Read full review
    Oracle
    No answers on this topic
    Return on Investment
    CMiC
    • Better project visibility, surely. I can step into a former project and see how well/poorly it was run.
    • Forecasting underway - nearly complete with year 2.
    • Cost status tracking - this has been valuable, especially when figuring out how much of a liquid budget is left over.
    Incentivized
    Read full review
    Oracle
    • It has allowed us to manage our submittals better and get the back in a timely manner to schedule projects accordingly and keep the flow going.
    • It can be a little time consuming to get the project data entered but if done right, it is worth it.
    Incentivized
    Read full review
    ScreenShots

    CMiC Construction Platform Screenshots

    Screenshot of CMiC FIELDScreenshot of CMiC AnalyticsScreenshot of CMiC Drawing ManagementScreenshot of CMiC FIELD