Contractor Foreman is an online construction management software for contractors and boasts users among contractors in more than 75 countries.
$588
per year
Oracle Primavera Submittal Exchange
Score6 out of 10
N/A
Oracle Primavera Submittal Exchange, part of the Primavera product suite, is offered as a secure, online system for electronically exchanging, reviewing, and archiving design and construction project documentation.
N/A
Pricing
Contractor Foreman
Oracle Primavera Submittal Exchange
Editions & Modules
Basic
$588
per year
Standard
$948
per year
Plus
$1,497
per year
Pro
$1,990
per year
Unlimited
$2,988
per year
No answers on this topic
Offerings
Pricing Offerings
Contractor Foreman
Oracle Primavera Submittal Exchange
Free Trial
Yes
No
Free/Freemium Version
No
No
Premium Consulting/Integration Services
No
No
Entry-level Setup Fee
No setup fee
No setup fee
Additional Details
Plans are based on features and licenses needed. Plus, Pro, and Unlimited plans include a 100-day money back guarantee.
As the name suggests, Contractor Foreman is GREAT for general contractors. However, being a consultant, I feel as though if upper management within the company I serve were more tech-savvy, they could accomplish much of the same tasks on other platforms that could give more advanced metrics. I also feel that the platform may feel outdated on purpose to ensure that those general contractors who aren't as tech savvy can understand the platform more.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
[Oracle Primavera Submittal Exchange] is very easy to train new users on it and have everyone on the same page. The daily reminder emails can be a pain but if there are documents needed from a trade it is a great way to remind the the it is in their ball of court to act accordingly and get the documents uploaded because there might be other trades waiting on them.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Timecards in rural areas are really difficult to handle. I know CF just released an offline timecard beta, which is a step in the right direction, but it would be nice to have offline data in the app and to have all timecards be offline until clockout, when they try to sync back to the server. The current beta doesn't work for us because it creates multiple timecards when the guys are in and out of signal.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
We have compiled so much information on CF it would be counterproductive to move to another software. We have also sold a lot of clients on the client portal feature. It is crucial for our communication between customers. The only reason we wouldn't renew the service is if somewhere offered the exact same service but at a lower cost
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Overall, Contractor Foreman is a great product, and I’m sure we’ve only scratched the surface of everything it has to offer. It can be a little quirky at times, occasionally displaying a 'Bad Gateway' message, but we haven’t experienced any timeout issues in the past few months. As we continue to use it, I’m confident we’ll uncover even more ways to streamline our workflow
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
The interface if fairly intuitive and the graphic display of many forms and reports is much better than Procore. I started using Submittal Exchange about 17 years ago. Primavera has worked to add features, but I have not been able to integrate them all into my workflow. I still use the original features more than the new ones.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Many times we had issues that turned out to be errors and bugs. At first, we would be told forcefully that there were no bugs, then we would document them, and we would get an acknowledgement but no apology for essentially either gaslighting us or being ignorant of their system
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Absolutely top notch! They were always there to help and immediately. Very happy with the communication they provided and the knowledge they had of their product. I would venture to say that they are one of the best in terms of support in their space.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Contractor Foreman’s pricing is much more cost-effective for small to mid-sized construction businesses, making it a better fit for my company’s budget. It offers an intuitive interface with pre-built construction templates, minimizing setup time and making it easier at least for my team to adopt and start using. The platform’s focus on project tracking, financial management, and nice integrations that makes it highly efficient for tracking project progress, staying on budget, and managing subcontractors/bills. These factors combined made it the ideal choice for meeting my company's specific needs efficiently and cost-effectively.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
My company uses Submittal Exchange when required by the client. The cost is too expensive for us to select as an enterprise because other clients require that we use different software.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
Prior to using Contractor Foreman we had to wait until the end to capture all change orders in one summary. Now, with the client portal, we can capture in real time and the client has visibility.
We have been trying to reduce administration time in tracking field expenses and with Contractor Foreman our field crew can uplaod reciepts and track expenses right from their mobile phones.
Punchlist - the punch list and To Do features are so robust we have drastically improved getting punchlists and small tasks completed in single trips without the wasted time and travel of multiple trips due to missed/forgotten items.
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info
A de minimis incentive was given to thank the reviewer for their time. The incentive was not used to bias or drive a particular response, nor was the incentive contingent on a positive endorsement. More Info